| page 22 | DYNO JET | |||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | ||||||||||||||||||||||
| Page | ||||||||||||||||||||||||||||||||||||||||||||
| I met with Environmental Police last week to get my hull number and to register the boat. He gave me a number of things to do which adds to my completion list. He suggested adding another bilge (one for each side of the pump), adding flotation, adding a blower and making the engine area watertight. The below picture also shows some work I need to do. The edge between the deck and the sides need to be finished with some kind of protection and I need to figure out the joint in the decking. | ||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||
| Test Run 2 We took the boat to Long Pond in Rutland. Not a bad place to do some testing as it is small, so there isn't a lot of boat traffic, and there is a great boat ramp. We still have some weight distribution issues and I will need to move some weight to the Port side. Also, the engine was running a little rough and I think I need to increasing the cooling capacity. Other than that things went very well!!!! |
||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||
| Previous | Next | |||||||||||||||||||||||||||||||||||||||||||