| Draft Environmental Impact Statement Shorts School Road Am Antenna Structures 73 � Temporary disturbance during construction would be limited by careful planning and scheduling of construction activities. � Traffic safety signs and flaggers, as necessary, would be used to inform and manage motorists about construction activities along Shorts School Road. � Use mulch and sediment barriers to prevent sediment from eroding and leaving the site. � When clearing and grading cannot be avoided, use mechanical barriers to erosion, including slash windrows, straw-bale dams, and erosion-control fabric where appropriate. � Comply with applicable requirements related to construction within a floodplain. � Require contractors to minimize construction noise and vibration impacts by shielding of noise equipment. � Require mufflers be used on all internal combustion engine-driven equipment 3.2.6 Significant Unavoidable Adverse Impacts Some short-term construction impacts would unavoidably occur such as interference with cultivation activities, traffic delays, and nuisance impacts associated with being in close proximity to construction activity. These are short-term impacts, which would cease once construction is completed. The proposed action would not change existing land uses or shorelines on a long term basis. Ninety nine percent of the site would continue to be used as agricultural land. |