Wow! What a snowfall.  The snow is almost up to the top of the railing which is at 36 inches.
Well, this concludes the pictures for the exterior.   Excavation was started on March 29 and the exterior was finished on November 18.  Its been a long haul but also a lot of fun.

I would like to say many thanks to J D Clark construction who did the foundation and exterior work.  Greg, AJ and Scott were a great group of guys to work with, very professional and very talented.  Also I would like to thank Jim for taking on this project.  He has been great to work with.