| 03/11/2006 Wow! What a snowfall. The snow is almost up to the top of the railing which is at 36 inches. |
|||||||||||||||||||||||||||||||||||||||||||||||
| Well, this concludes the pictures for the exterior. Excavation was started on March 29 and the exterior was finished on November 18. Its been a long haul but also a lot of fun. I would like to say many thanks to J D Clark construction who did the foundation and exterior work. Greg, AJ and Scott were a great group of guys to work with, very professional and very talented. Also I would like to thank Jim for taking on this project. He has been great to work with. |
|||||||||||||||||||||||||||||||||||||||||||||||