Well the back of the house is sided and the guys have started working on the deck.  So far it really looks great.
                10/21/2005

AJ is putting the balusters in the rails. The balusters are 3/4 inch powder coated aluminum,  The deck is Evergrain which is a composite material.  This should be a maintenance free deck.
                10/21/2005

AJ is now installing the assembled railing.  It kinda looks like he is in jail but really he's not.  Greg is measuring twice and cutting once.  He is a perfectionist and likes to get things right.
               10/21/2005

Scott is working on the front deck.  We ordered the front door in August but the first one came in damaged and it had to be reordered.  We finally received it and it is about to be installed.