CIRCULATION
NETWORK
The existing
circulation system of Kalayaan consists of network of
linear and circumferential roads, which links the town's
various settlements and other functional areas. The
National Road serves as the main ingress/egress road and
the major development spine of the municipality. The two
other barangays are linked to the towns center by the
provincial and the barangay roads.
Just like
other municipality, the grid type of road development is
evident in the Poblacion.
ROAD
NETWORK
As of 1995,
the total road kilometer range accounts to 23.02
kilometers of which 30.89% are national roads; 38.18%
are provincial roads; 18.5% are barangay roads. With a
total land area of 4,660 hectares, the road density is
4.93 kms. of road per 1,000 hectares.
With regards
to type of pavement, almost 72% are concreted; 19%
asphalt paved and 9.0% earth filled.
See the
following tables for Road Inventory
TABLE 40
ROAD INVENTORY BY CLASSIFICATION LENGTH/TYPE OF
PAVEMENT KALAYAAN, LAGUNA 1995
Administration/
Classification |
Length (Km.) |
Width (meter) |
Concrete |
Pavement Asphalt Gravel Earth fill
|
National Provincial Municipal Barangay |
7.18 8.79 4.20 2.86 |
6.3 6 4 3.5 |
1
km. 8.79 km 4.11 km 2.54 km 16.44
km |
4.45
4.45 |
|
1.65 km
0.150 km
0.31 km
2.11
km |
Total |
23.02 |
(5
met.) Ave. width
|
|
|
|
|
Source: Office
of MPDC
TABLE
41 INVENTORY OF NATIONAL ROAD KALAYAAN,
LAGUNA 1995
National Road |
Location |
Length |
Pavement |
Highway
(Longos) Real St. San Juan Highway (San
Juan) Dela Paz (Ilog Bayan to
Nahikan)
|
Longos San
Juan San Juan San Antonio
|
1,980 795.5 1,677 2,658
|
Asphalt Asphalt Asphalt Concrete/
Earth fill
|
Total |
|
7,110.5(m) |
|
Source: Office
of MPDC
TABLE
42 INVENTORY OF PROVINCIAL ROAD KALAYAAN,
LAGUNA 1995
Name
of Road |
Location |
Length |
Pavement |
Real St.
(Longos) |
Longos |
660 |
Concrete |
San Luis Road (longos
to Sn Ant.) |
Longos |
1,170 |
Concrete |
Dela Paz (Longos to
Ilog Bayan) |
San Antonio |
966 |
Concrete |
Total |
|
8,796(m) |
|
Source: Office
of the MPDC
TABLE
43 MUNICIPAL STREET INVENTORY KALAYAAN,
LAGUNA 1995
Name
of Road |
Location |
Length |
Pavement |
Cablit Molina Montes Abonales Maderal Sabio Church La
Virgen Esperanza Conception San
Roque De Los Barrios San Juan San
Isidro San Roque E.
Montes Macatangga Cabugason Hi-way to Ice
Plant Hi-way to Twin Falls Hi-way
(Pinak)
|
Longos Longos Longos Longos Longos Longos Longos Longos Longos Longos Longos San
Juan San Juan San Juan San Juan San
Juan San Juan San Juan San Juan San
Juan San Juan
|
115 108.5 588 178 107 74 72 206 310 217 170 795.5 103 130 199 242 89 90 150 221 100
|
Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Earthfill Concrete Concrete |
Total |
|
4,265 meters |
|
Source: Office
of the MPDC
TABLE
44 INVENTORY OF BARANGAY ROADS KALAYAAN,
LAGUNA 1995
Name
of Road |
Location |
Length |
Pavement |
Callejon Acueza Baul-Bagul Laforga Asedillo Dela
Fuente Cabamalan Valeña San
Antonio San Pablo Fabricante
|
Longos San Antonio San Antonio San
Antonio San Antonio San Antonio San
Antonio San Antonio San Antonio San
Antonio San Antonio
|
126 624 294 288 277 200 84 103 541 230.8 104 |
Concrete Concrete/Earthfill Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete |
Total |
|
2,931.8 |
|
Source: Office
of the MPDC
BRIDGES
There is a
total of 22 bridges in Kalayaan of which 8 are located
in Brgy. Longos; 13 are in Brgy. San Juan and 1 in Brgy.
San Antonio. It has a total length of 84.35 linear
meters. All are in good condition except C. Montes
Bridge which was already destroyed. Almost all were
concreted and only 2 were made steel and
wood.
See the following
table for Inventory of Bridges
TABLE
45 INVENTORY OF BRIDGES KALAYAAN,
LAGUNA 1995
Name
of Bridge |
Location |
Length (L.M.) |
Width |
Type |
Longos
(Hi-way) Longos (Real) La
Virgen Esperanza Concepcion San
Roque Alagaw San Isidro San Juan
(Hi-way) San Juan (Real) I San Juan (Real
Brgy. Hall) E. Montes Macatangga Ice
Plant (Rd.) 1st Ice Plant (Rd.)
2nd Irrigation Bridge San Roque
(Roja) Wawa Bridge
(Bado) Elmer Pare No name Subaan
(Kalayaan to Lunao)
|
Longos Longos Longos Longos Longos Longos Longos Longos San
Juan San Juan San Juan San Juan San
Juan San Juan San Juan San Juan San
Juan San Juan San Juan San Juan San
Juan San Antonio
|
6.64 4.60 6.00 6.00 6.00 6.00 15.00 23.50 14.20 3.20 6.35 10.0 5.5 6.70 9.50 9.25 3.50 5.40 3.30 3.00 3.00 10.00
|
6.90 3.70 3.85 3.85 3.85 3.85 5.00 5.00 6.40 6.00 6.00 4.00 3.80 4.25 3.20 1.00 1.60 2.40 2.50 1.70 1.50 4.00
|
Concrete Concrete Concrete Concrete Concrete Concrete Steel
& Wood Steel &
Wood Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete
|
Total |
|
84.35 |
|
|
Source: Office
of the MPDC
DEVELOPMENT
NEEDS
Considering
the generally rural characteristic of the area, the
total land area will be used to determine the adequacy
and future requirements of roads. Thus, with a total
land area of 4,660 hectares, and a total road
kilometrage of 23.02 kms., the present road land ratio
is 0.49 kms. per 100 hectares of land. With the standard
of 1 kilometer for every 100 hectares, 23.58 kms. of
additional road is needed to meet the standard
requirement. Future additional needs should be based on
feasible studies. Moreover, the
improvement/upgrading/maintenance of the condition of
existing roads and ridges must be given top
priority.
|