My Job in Leighton  

中環填海三期(2003)  天水圍輕鐵線(2002)  機場新停機坪(2001)

將軍澳地鐵站(2000)  慈愛四期居屋(1999)  粉嶺康和居屋(1998)

机場德航大樓(1997)  狗虱灣火藥庫(1995)  會展中心填海(1994)

西九龍填海區(1993)  昂船洲鋪水管(1991)  東區走廊三期(1988)

 

Main Page            最近修改日期  2003/04/01    


 

 

計數器

Main Page

H2189 Central(2003) 

H2028 LRTC(2002) 

H2038 Airport(2001)

H2018 MTRC(2000)

H2038 Tsz Oi(1999)

H1688  Fan Ling(1998)

H1899   LSG(1997)

H977   KSW(1995)

H997   Wan Chai(1994)

H1368 W.KLN(1993)

H899 SCI(1991)

H579 HKIEC(1988)

     

 

 

My jobs for others

Tuen Mun Reclam

Sha Tin Roadwork

Ah Kung Kwok seawall

Tai Po Rd. modification

GZS highway

Power station

 H2018 -  天水圍輕鐵        

 TSW Light Rail  CC-230                


  new function - farewell dinner for Gary Chu and Raymond Lai

        

        new event - topping out of Viaduct at Junction L

 

 

 

 

No Helmet, 

no entry 

 

 

 

 

地盆安全   

戴帽為先

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Main job at TSW : build 11 Stops and 4.4km rail track

   
Phase 4 Stop 435, Stop 450, Stop 455, Stop 500
Reserve zone

Stop 468vaiduct, Stop 480, Stop 510, Stop 520, Stop 530, Stop 540, Stop 550

 

                          

              
Works involved pilings
  underground utilities/drainage diversion
  small buildings, R14, R15,R16, S3,TO4, TO5
  surcharge and band drain
  Stops construction
 

track rail & overhead lines (by system department)

 

 

down : Stop468 天頌站- Viaduct Construction nearby

Chung Fu , Tin Shui Road   (26/6/2002)       

 

    

     

 

 

 

down : Stop 450 天湖站 - opposite to TSW swimming pool

 

 

 

          

 

  Civil Works

             
Project Director Grey Jeque
Project Manager Jerry Wong
Deputy Project Manager Desmond Sze
Senior Site Agent K.W.Cheung
Site Agent David Packwood
Sub Agent Raymond Lai
Sub Agent Joe Sham
Senior Engineer Gary Chu
Senior Engineer Raymond Chow
Site Engineer Thomas
Superintendent T.M. Tsui
Supervisor K.H. Choy
Supervisor W. K. Lau
Foreman Cheung, Chung, Fung
Engineer assistance Terry Tsui
Engineer assistance Ming
Surveyor S.M. Chan

 

 

 

 

 

 

A. Earthwork by Siu Seung

 

 

 

 

 

up : band drain installation for viaduct approach ramp 

at junction L Stop 468 天頌站

 

 

 

 

 

 

up : Surcharge at Stop 480 天富站

 

 

 

 

 

up :Surcharge for viaduct approach ramp 

at junction L Stop 468 天頌站

 

 

 

 

up : surcharge for viaduct approach ramp 

at junction L Stop 468 天頌站

 

 

 

 

 

 

 

 

B. Existing utilities,watermain diversion

 

 

 

 

 

 

 

 

 

up : Watermain diversion at stop 480 天富站

 

 

 

 

 

 

up : Watermain diversion at stop 480 天富站

at final connection location

 

 

 

 

 

 

 

 

C. Stop construction by Kong Lee

 

 

 

 

 

 

up :Stop 450 天湖站 (26/6/2002)

 

 

 

up : Stop 450 天湖站 (10/10/2002), already hand over to DB2020

 

 

 

 

 

 

up :Stop 435 天慈站 (26/6/2002) 

   

down :Stop 435 天慈站 (10/10/2002)

 

 

up : Stop 435 天慈站 -  photo taken on 22/7/2002

 

 

down :Stop 435 天慈站 (10/10/2002)

 

up : Stop 510 天悅站 (26/6/2002)     

down : Stop 510 天悅站 (10/10/02)

 

 

 

 

up : Stop 500 銀座站 (26/6/2002)

 

 

up : 天逸站 Stop 550 (platform 3, 4, 5)    10/10/2002  

down : 天逸站 Stop 550 (platform 1, 2)   10/10/2002

 

 

 

Gary Chu, Chung, Raymond Lai, K.H.Choi, W.K.Lau

 

 

The Inspector, Ben and Roger

 

 

 