My Job in Leighton  

中環填海三期(2003)  天水圍輕鐵線(2002)  機場新停機坪(2001)

將軍澳地鐵站(2000)  慈愛四期居屋(1999)  粉嶺康和居屋(1998)

机場德航大樓(1997)  狗虱灣火藥庫(1995)  會展中心填海(1994)

西九龍填海區(1993)  昂船洲鋪水管(1991)  東區走廊三期(1988)

 

Main Page            最近修改日期  2002/07/26    


 

 

計數器

Main Page

H2189 Central(2003) 

H2028 LRTC(2002) 

H2038 Airport(2001)

H2018 MTRC(2000)

H2038 Tsz Oi(1999)

H1688  Fan Ling(1998)

H1899   LSG(1997)

H977   KSW(1995)

H997   Wan Chai(1994)

H1368 W.KLN(1993)

H899 SCI(1991)

H579 HKIEC(1988)

     

 

 

My jobs for others

Tuen Mun Reclam

Sha Tin Roadwork

Ah Kung Kwok seawall

Tai Po Rd. modification

GZS highway

Power station

   H579 -  東區走廊  

Contract No.  HY/86/28 

- HK Island Eastern Corridor, Phase 3

               

 

 

  

 

 

 

          

   

 location plan and bird eye view of site

 

 

The job start in May,1987. It cost 260 million 

and last for 30 months.

We built 1.5 km main line at grade 

and 0.8 km elevated structure.

 

             

  

 

 

 

 

                                                                        

          

 
Project Manager Tony I.
Site Agent  Kenny Chan 
Sub Agent Peter Tsang
Senior Engineer Raymond Lai
Senior Engineer  K.M.Fan
Senior Engineer Michael Ng
Site Engineer Henry Wu
Site Engineer Thomas Chow
Site Engineer T W Chung
Site Engineer K K Chan 
Site Engineer Andrew
Site Engineer  MY Cheng
Superintendent Fat Lee
Senior Q.S K.K.Poon
Q.S. Freb. Yu
Senior Surveyor K. C. Yuen

 

 

A handover ceremony held on site

 

 

 

        

 

 

 

 

The road was going to be opened to public

 

 

 

 

After work, we organized a bowing champion

---Chung Tak Wah was always the organizer

 

 

 

 

Leighton anticipate in a car-racing champion at Victoria Park in 1989

 

Hosted by www.Geocities.ws

1