| duration |
Job |
Job nature |
details |
| 2003.4-present |
CRIII |
Central Reclamation |
sub-agent |
| 2001-2003.3 |
LRT |
LRT at Tin Shui Wan |
sub-agent, report to Senior Site agent, looking after
underground drainage works and LRT stops structure |
| 2000-2001 |
Airport |
Airport Runway Phase 2 |
sub-agent, report to Production Manager, looking after
drainage works |
| 2000-2001 |
MTRC |
Tsang Kwan O MTRC Station
Leighton-China State Joint Venture |
sub-agent, report to Senior Site agent, looking after
MTRC tunnel works |
| 1998-2000 |
Housing |
Tze Oi Housing Job |
sub-agent, report to Chief Engineer, looking after Facade
and underground drainage works |
| 1997-1998 |
Housing |
Fan Ling Housing Job |
sub-agent, report to Senior Site Agent, looking after
Facade production |
| 1996-1997 |
Airport |
LSG Lufthansa Catering Facility at Chek Lap Kok new
airport(C822)
Leighton Contractors(Asia)Ltd. |
sub-agent, report to D. project Manager, setting up Q. A.
system & looking after external drainage, roadwork & ultilities |
| 1995-1996 |
HK |
Explosives Complex at Kau Shat Wan(CV/94/01)
Leighton Hochtief Joint Venture |
sub-agent, report to Senior Site Agent, looking after all
marine works |
| 1994-1995 |
TTD |
Waichai Reclamation Phase 1
Leighton Contractors(Asia)Ltd. |
sub-agent, report to Project Manager, looking after all
marine works |
| 1993-1994 |
HK |
West Kowloon Reclamation,Northern area
Phase II(UA9/91)
Leighton Contractors(Asia) Ltd |
senior engineer, report to Senior Site Agent, looking
after the casting yard & seawall construction |
| 1991-1992 |
HK |
North West Kowloon Sewage Treatment & Disposal
CV/87/15-rising mains & inlet works
Leighton Lama Joint Venture |
senior engineer, report to Senior Site Agent, looking
after laying of 2000mm dia. water mains, piling and construction of access
chamber |
| 1988-1990 |
Highway |
H. K. Island Eastern Corridor Phase 3
Leighton Contractors(Asia)Ltd. |
senior engineer, report to Site Agent, looking after the
construction of the flyovers and subways |