中環填海三期(2003)  天水圍輕鐵線(2002)  機場新停機坪(2001)

將軍澳地鐵站(2000)  慈愛四期居屋(1999)  粉嶺康和居屋(1998)

机場德航大樓(1997)  狗虱灣火藥庫(1995)  會展中心填海(1994)

西九龍填海區(1993)  昂船洲鋪水管(1991)  東區走廊三期(1988)

 

Main Page            最近修改日期  2003/04/30    


 

 

計數器

Main Page

H2189 Central(2003) 

H2028 LRTC(2002) 

H2038 Airport(2001)

H2018 MTRC(2000)

H2038 Tsz Oi(1999)

H1688  Fan Ling(1998)

H1899   LSG(1997)

H977   KSW(1995)

H997   Wan Chai(1994)

H1368 W.KLN(1993)

H899 SCI(1991)

H579 HKIEC(1988)

     

 

 

My jobs for others

Tuen Mun Reclam

Sha Tin Roadwork

Ah Kung Kwok seawall

Tai Po Rd. modification

GZS highway

Power station

 從事建築工作二十多年,有所感而寫

 

滿

 

 

   

                                                                     

   My job in Leighton

       
duration Job Job nature details
2003.4-present CRIII Central Reclamation sub-agent
2001-2003.3 LRT LRT at Tin Shui Wan sub-agent, report to Senior Site agent, looking after underground drainage works and LRT stops structure
2000-2001 Airport Airport Runway Phase 2 sub-agent, report to Production Manager, looking after drainage works
2000-2001 MTRC Tsang Kwan O MTRC Station

Leighton-China State Joint Venture

sub-agent, report to Senior Site agent, looking after MTRC tunnel works
1998-2000 Housing Tze Oi Housing Job sub-agent, report to Chief Engineer, looking after Facade and underground drainage works
1997-1998 Housing Fan Ling Housing Job sub-agent, report to Senior Site Agent, looking after Facade production
1996-1997 Airport LSG Lufthansa Catering Facility at Chek Lap Kok new airport(C822)

Leighton Contractors(Asia)Ltd.

sub-agent, report to D. project Manager, setting up Q. A. system & looking after external drainage, roadwork &  ultilities
1995-1996 HK Explosives Complex at Kau Shat Wan(CV/94/01)

Leighton Hochtief Joint Venture

sub-agent, report to Senior Site Agent, looking after all marine works
1994-1995 TTD Waichai Reclamation Phase 1

Leighton Contractors(Asia)Ltd.

sub-agent, report to Project Manager, looking after all marine works
1993-1994 HK West Kowloon Reclamation,Northern area  Phase II(UA9/91)

Leighton Contractors(Asia) Ltd

senior engineer, report to Senior Site Agent, looking after the casting yard & seawall construction
1991-1992 HK North West Kowloon Sewage Treatment & Disposal CV/87/15-rising mains & inlet works

Leighton Lama Joint Venture

senior engineer, report to Senior Site Agent, looking after laying of 2000mm dia. water mains, piling and construction of access chamber
1988-1990 Highway H. K. Island Eastern Corridor Phase 3

Leighton Contractors(Asia)Ltd.

senior engineer, report to Site Agent, looking after the construction of the flyovers and subways

 

 

 