NOHN PAGES
SEABIRD´86
BUILDING STEP 14

Cockpit

To got a tight fit of the panels it needs some thoughts about the cuting sequence and about drawing the cuting lines on the Plywood sheets. All in all it needs one working day.
Before I can finaly install the cockpit panels, there is a lot to do: hardware, motor mount, vents, painting inside...
Cockpit is installed

seabird original
seabird modified version

building steps
building step 1   Model
building step 1a more model pictures
building step 2   The new workshop
building step 3   Preparations
building step   Keel & Bottom
building step 5   Horn assembly
building step   Bulkheads & Transom
building step 7   Hardware & Vents
building step   Stringers & Clamps
building step 9   Rudder
building step 10 Side panels & Bilge panels
building step 11 Main sheer moldings & windows
building step 12 Tabernacle posts
building step 13 Deck
building step 14 Cockpit

miscellaneous
going around the boat
breakdowns
scarfing tool
load handling

links
seabird ´86 index
back to top
mailto: [email protected]

Hosted by www.Geocities.ws

1