| Addition Construction (4) | ||||||||||||||||||
| Here are pictures of the construction of the 12 foot extension. Construction began Dec 24, 2002. These pics were taken in July 2003. | ||||||||||||||||||
| Home Locomotives Freight Cars Cabins Rail Road Structures DeKalb Structures Misc. Structures Actual Track Plan Theoretical Track Plan Links |
||||||||||||||||||
| Click here to go to page 2 of the "Addition Construction" page. | ||||||||||||||||||
| Click here to go to page 3 of the "Addition Construction" page. | ||||||||||||||||||
| (Below): Here is an overview of how the area around SY tower is taking shape. The big blue area will eventually be filled in with the Sycamore industrial park. | ||||||||||||||||||
![]() |
||||||||||||||||||
| (Below): Here is a shot of the other side of Sycamore yard. #25 is exiting the tunnel headed to down town DeKalb. The road is not yet finished and the stream bed is taking shape. DT Tower will sit in the bottom right of this photo. | ||||||||||||||||||
![]() |
||||||||||||||||||