The MDF machine build is moving ahead.  The base is complete except for attaching the stepper motor and lead screw.  The base and gantry have been painted.  The X-axis has also been glued up and painted with black, hammered-finish paint.


In addition to all the painting and gluing, the rails for the Y-axis have been installed and squared up.  They are now ready and waiting for the gantry to be installed and adjusted.  Once that is done, I will install the X-axis rails and the X-axis.  Then all that will be left is to build the Z axis, install and adjust it, and hook up the electronics.  
Base with rails (1" galvanized pipe) sitting on a tub.  Some sort of stand will be built.
Gantry in hammered-black paint.  That stuff is good at covering mistakes!
Links:
Foundry Home
Home
Contact Info:
Painted Y-axis bearing supports. (1 1/4" angle iron and 1/4" bolts welded on)
Email:
[email protected]
X-axis.  I did a little playing with the 1/4" roundover bit and trim router...