INSIDE WORK - Part I
Log Home Construction by the Homeowners:
Ron and Susan Colbow & Families

 

HOME

1. BEFORE THE KIT ARRIVES - Part I
2. BEFORE THE KIT ARRIVES - Part II
3. THE KIT IS DELIVERED
4. LOG WALL CONSTRUCTION - Part I
5. LOG WALL CONSTRUCTION - Part II
6. ROOF CONSTRUCTION - Part I
7. ROOF CONSTRUCTION - Part II

8. WALK OUT BASEMENT WALL SIDING
9. SHINGLING THE ROOF
10. SEPTIC SYSTEM INSTALLATION
11. OUTSIDE TRIM
12. INSIDE WORK - Part I
13. INSIDE WORK - Part II

 

log home construction, inside work The ceiling in the Great Room is T-111 paneling which is cheaper than 1"x 6" tongue & groove paneling, goes up faster and looks great.

Top of Page

Installing ceiling lights is always fun. This one is above the Master Bath shower.

Top of Page

Plumbing by a local subcontractor and electrical work by Ron Colbow.

Top of Page

Glass block over the Master Bath tub.

Top of Page

A local glass company installs the fixed glass.  The double pane glass was fabricated locally after taking measurements on site.  This fixed glass window is much cheaper than one purchased from a window manufacturer and it looks every bit as good. 

Top of Page

<<< Previous Page  

Next Page >>>

This site is sponsored by:

B & H CEDAR LOG HOMES, L.L.C.
"Life-Styles in Solid Cedar"
65 Nottingham Dr. - Fredericksburg, Virginia 22406
------------
Phone: 540-752-4106 - E-Mail: [email protected]

Copyright 2000, 2001, 2002 © B & H Cedar Log Homes, L.L.C. All rights reserved.
Send mail to [email protected] with questions or comments about this web site.
Last updated:01/09/2002

 

 


 

privacy

Hosted by www.Geocities.ws

1