1969 Avion Truck Camper Restoration

The restoration continues


The work continues with a lot of cleaning, assembling, installing, and repairing (and, in some cases, re-repairing).  I discovered more wood rot in the bathroom floor under the toilet/holding tank and replaced the damaged wood. These photos show the wood patch and the bath during reassembly.

 
I've repaired all the interior wood parts and made new panels and patches where necessary, stained and finished all the wood, assembled and repaired the plumbing, and generally done a lot of fitting/installing/assembling/cleaning/repairing/caulking of the interior.  Even though I have not used a lot of text to detail every task, this portion of the work has required an investment of over 110 hours.  That seems like a lot of time, but sometimes you gotta take the time to do it right.


 

     Page 8 : The finishing touches
    Back: to main page
 