| 4 | Indicative Specification (cont'd.) |
| 4· 8 |
Windows and External Doors |
|
Replacernent double glazed steel windows doors and screens throughout; allowance for rnotorised black out blinds to auditoriums; shutter door to loading bay. |
|
| 4.9 | Internal Walls |
|
Blockwork partitions generally throughout. |
|
| 4.10 | Internal Doors |
| Allowance of £800 and £1200 per door for single and double doors respectively and associated frames and ironmongery; internal shutter door to loading bay·. | |
| 4.11 | Internal Floor Finishes |
| Cement and sand screed to new floor structures; latex screeds to existing floors: rubber/linoleum floor finiishgenerally throughout; carpet tiles to administration areas; ceramic tiling to bars and kitchen; timber decking to restaurant; allowance for entrance matting and skirtings. | |
| 4.12 | Internal Wall Finishes |
| Plaster and emulsion paint generally; allowance for refurbishing existing tiled floors to basement bar and entrance foyer circulation areas with allowance for make up with new to match existing; ceramic tiles to WCs and kitchen; acoustic panels to orchestra pit. | |
| 4.13 | Internal Ceiling Finishes |
| MF suspended ceiling generally throughout with emulsion paint finish; acoustic panels to plant rooms and auditoriums. | |
| 4.14 | Fixtures and Fittings |
| Basement, ground and first floor bar counters; fitting out cloakrooms and ticket office; fitting out basement and second floor kitchens; allowance for toilet cubicles, vanity units and duct panelling to toilets; allowance for shop shelf units and counter; stage to small auditorium; seating to auditoriums; signage generally. | |
| 4.15 | Services |
| Sanitary ware, hot and cold water services and waste plumbing; heating system; mechanical ventilation to toilets and kitchens; air conditioning to auditoriums, bars and restaurant; electrical installation; lift and dumb waiter installations; allowance for new mains services; allowance for underground drainage installation; builder’s work in connection. | |
| 4.16 | External Works |
| Allowance for works to forecourt. | |
| 4.17 | Preliminaries |
| Main contractors site administration costs, scaffolding and the like based on a fifty two week construction period. |
![]() |
![]() |
![]() |