ANTICIPATED PROJECTS
Proposed 6-storey building in place of Imelda Building.
50 new sets of computer hardwares and computer accessories.
ON-GOING PROJECTS SY. 2004 - 2005
Covered court.
Standard-sized stage.
Service vehicle.
Alternate gate (service road) - area under the bridge along the dead creek
Installation of iron grills and control gates (by floors) of VPE I and VPE II.
PROJECTS SY. 2003 - 2004
Rehabilitation of the water supply system, and installing the water tank.
Installation of a drinking fountain.
Relocation of the deep well water tank.
Request for a second uniformed guard granted by the city government.
Construction of an alternate gate/point of entry along San Ignacio st.
Augmentation of a perimeter steel wire fence at the back of Imelda Bldg.
PROJECTS SY. 2002 - 2003
Cementing of the stairs from the old gate to the inner campus.
Cementing of the covered walk from Imelda Building to VPE II Bldg. acquisition of 26 new sets of computer hardwares (CPU, monitor, keyboard, mouse, AVR, table and chair).
Augmentation of perimeter wall behind VPE II Bldg. with steel wires and cyclone wires.
Installation of iron grills and gate of VPE II.
Acquisition of two units of air conditioners for the computer rooms.
Installation of iron grills on the corridors and windows from second floor to sixth floor of VPE II.
Repair and replacement of dilapidated steel wire fence fronting San Ignacio St. of Bo. Kapitolyo.
Fencing of the area under the bridge.
Renovation of the roof deck of VPE I Bldg. and its insulation.
Repainting of the roofs of the covered walks (pathways).