| |
 |
| Phase I |
Project Design Reports for all types of
Roadway
and Structure
Projects,
Geometric
Design,
Intersection
Design
Study
(IDS),
Structure/bridge
Concept
(TS&L)
Plans |
| Phase II |
Plans, Specifications and Estimates (PS&E)
for all
types
of Roadway
and Structure
Projects |
|
| | |
| |
 |
| |
Right-of-Way Plans, Plats and Legals |
|
| | |
| |
 |
| Phase I |
Survey included Right-of-Way determination,
Alignment,
Horizontal
and Vertical
Control,
TOpo,
Drainage
and Utility,
Tree Survey,
Stream
and Floodplain
Survey
|
| Phase II |
Survey including Right-of-Way Staking,
Monumentation,
Verification
of Tops
and Utilities |
|
| | |
| |
 |
| a. |
Temporary and Permanent Traffic Control
and Stage
Construction-
Complete
Contract
Plans,
Specifications
and Estimates
(PS&E)
|
| b. |
Pavement Marking- Complete Contract Plans,
Specifications
and Estimates
(PS&E)
|
|
| | |
|
 |
| |
Concept Plans and Repots, Contract Plans,
Specifications
and Estimates
(PS&E) |
|
| | |
|
|
| |
 |
| |
Civil, Structural Lighting and Electrical
working
including
security
Systems |
|
| | |
| |
 |
| Phase I |
Location Drainage Study (LDS), River and
Stream
Hydraulics,
Hydraulics
Studies
and Reports |
| Phase II |
Contract Plans, Specification and Estimates
(PS&E) |
|
| | |
| |
Highways, Public Facilities, Commercial,
Parking Structures, etc, Phase I Study and Phase
II Contract Plans, Specifications and Estimates
(PS&E) | | |
|
 |
| |
Study and Repots, Concept Plans, Contract
Plans,
Specifications
and Estimates
(PS&E) |
|
| | |
|
 |
| |
Onsite materials inspection and In-plant
proportioning
for PCC
and Bituminous
Materials,
Construction
Inspection
and, Staking
and Layout |
|
| | |
|
 |
| |
Concept Plans and Reports, Contract Plans,
Specifications
and Estimates
(PS&E) |
|
|
|
|
|