Home
 Powder Coating Equipment
 Conveyors
 Spray Booths
 Ovens
 Turnkey Systems
 
 Equipment
 Raw Material
 Air Compressors
 Dust Collection, Filters
 Pre treatment Chemical 
 Masking Products
 Powder Coating Units
 Powder Manufacturers
 Testing Equipment
 Testing Labs
 
 Associations
 Consultants
 Used/Surplus equipment
 Books Periodicals
 Jobs/Appointments

 


 

Testing Labs

Testing is performed on the finished film to confirm that it has all of the performance properties that the material is supposed to provide. Testing confirms that the pretreatment process is working correctly, providing the necessary properties to the substrate prior to coating application. Testing also confirms that the powder has been properly applied and cured. Initial testing of a coating process is used to establish a standard. Periodic testing is done to confirm that  the process is able to maintain the standard. Panels for coating tests are run through the washer and then coated the same as production parts. The panels are usually aged for 24 hours at room temperature prior to testing.

 
Th
Coaters Test Laboratory
Shop No 1 & 2, Shree Sadan, 90 ft Road
Sane Guruju Mulund (E)
Mumbai 400 081
Tel 568 4659
Fax 568 2810

 
 
Hosted by www.Geocities.ws

1