Building a House
Last update: Feb 8.04
Back to Main
For more information of each step, click the graphic
We started on the roof in late July, which took a couple of weeks.  We then put on the house-wrap and the 2" exterior styrofoam insulation.  The windows and doors arrive and were installed.  Fall harvest interrupted our work and in early September we poured the basement floor.  We also poured the driveway and patio concrete and George Krahn construction put up the insterior walls.  The plumbers came to install plumbing and heating and we ran all the wiring.  (I think over 200 electrical boxes in all.)  The walls were insulated as the weather turned cold in late October and the drywallers came after the vapour barrier was installed.  The mudders and painters followed  with the flooring guy coming in late November.  The cabinets were then installed.  The finisher installed doors and trim as we installed light fixtures and finished electrical stuff and the house was pretty much finished.
Back to House
Hosted by www.Geocities.ws

1