2010-2011 |
|
Tripatra Engineers & Constructors (TPEC) |
|
Project |
|
Blanket Engineering Service for PHE ONWJ |
|
Position |
|
Sr. Mechanical Engineer |
|
Responsibility |
· |
Coordinate & Supervise Basic and Detail Engineering Design for new facilities (green field), modification works for existing facilities (brown field) which cover: site surveys, review the modification of P&ID and PFD. |
|
|
· |
Check & Review Engineering Deliverables: Equipment List, Equipment Selection and Specification Review, Equipment Layout Study, Material Handling Study, Equipment Data Sheets, Cost Estimation and EPCI Schedule. |
|
Work Orders |
1. |
Appraise and Select Stage Study for Gas Lift Compressor Installation on KL P/F. |
|
|
2. |
Conceptual study for UL P/F Development. |
|
|
3. |
Detail Bravo Control System Retrofit. |
|
|
4. |
FEED for Echo Pump Replacement. |
|
2010-2011 |
|
Tripatra Engineers & Constructors (TPEC) |
|
Project |
|
Engineering Services for Danagas (UAE) |
|
Position |
|
Lead.Mechanical Engineer |
|
Responsibility
|
· |
Coordinate & Supervise for Engineering Detail Design of New Offshore Platform. |
|
|
· |
Engineering Design Project: Conceptual, Front End Engineering Design (FEED) & Detail Design for New Onshore Gas Processing Plant Facilities, including: Review PFD and P&ID. |
|
· |
Check & Review Engineering Deliverables: Mechanical Design Basis, Equipment Selection, Equipment List, Equipment Specifications & Data Sheets, Cost Estimate, Mechanical Handling Study, and, Equipment Layout Study. |
|
|
|
· |
Check & Review Equipment Enquiry Requisitions, Technical Bid Evaluation, Technical Purchase Order. |
|
|
· |
Check & Review Vendor Document Review |
|
|
· |
Prepare Manpower Loading and Man-hour Cost Estimation. |