2011-2014 |
|
ConocoPhillips Indonesia Ltd (COPI) |
|
Project |
|
Letang Tengah Rawa Optimization (LTRO) Project |
|
Position |
|
Sr. Mechanical Engineer |
|
Responsibility
|
· |
Supervising and monitoring EPC Contractor during perform detail design and construction engineering for mechanical and other related engineering disciplines, including review and approval Engineering Deliverables (Addendum Specification, Datasheet, Calculation, Equipment List, Drawing), Equipment Selection, MTO, Technical Request for Quotation, Vendor’s Technical Bid Evaluation and Vendor’s Document. |
|
|
· |
Witness Factory Acceptance Test (FAT) of Equipments at Vendor’s Workshop. |
|
|
· |
Field Supervision of EPC Contractor on site during construction for Equipment Installation, including Pre-Commissioning, Start-up and Commissioning. |
|
2014-2017 |
|
ConocoPhillips Indonesia Ltd (COPI) |
|
Project |
|
Sumpal Compression Project |
|
Position |
|
Sr. Mechanical Engineer |
|
Responsibility
|
·
|
Supervising Engineering Consultant during perform FEED (FEL3) Design for mechanical and other related engineering disciplines, including review and approval engineering deliverables (datasheet, calculation, equipment list, drawing), equipment selection, MTO, technical request for quotation. |
|
|
· |
Prepare tender document, and bid contract for Company Furnished material (Air Cooled Heat Exchanger, Pressure Vessels, etc), and review vendor’s Technical Bid Evaluation. |
|
|
· |
Prepare tender document, and bid contract for EPC Contractor, and review Contractor’s Proposal with others discipline. |
|
|
· |
Supervising and monitoring EPC Contractor during perform detail design and construction engineering for mechanical and other related engineering disciplines, including review and approval Engineering Deliverables (Addendum Specification, Datasheet, Calculation, Equipment List, Drawing), Equipment Selection, MTO, Technical Request for Quotation, Vendor’s Technical Bid Evaluation and Vendor’s Document |
|
|
· |
Witness Factory Acceptance Test (FAT) of Equipments at Vendor’s Workshop. |
|
|
· |
Field Supervision of EPC Contractor on site during construction for Equipment Installation, including Pre-Commissioning, Start-up and Commissioning. |