2010-2011 |
|
Tripatra Engineers & Constructors (TPEC) |
|
Project |
|
Engineering Service for Bangka Top Side Modification (Chevron) |
|
Position |
|
Sr. Mechanical Engineer |
|
Responsibility |
· |
Coordinate & Supervise Front End Engineering Design (FEED) for modification existing facilities (brown field) for Floating Product-ion Unit (FPU), which cover: site surveys, review the modification of P&ID and PFD. |
|
|
· |
Check & Review Engineering Deliverables: Equipment List, Equipment Selection and Specification, Equipment Layout Study, Material Handling Study, Constructability Study, Equipment Data Sheets, Cost Estimation and EPCI Schedule. |
|
|
· |
Prepare Manpower Loading and Man-hour Cost Estimation. |
|
2010-2011 |
|
Tripatra Engineers & Constructors (TPEC) |
|
Project |
|
Engineering Services for Premier Oil |
|
Position |
|
Lead.Mechanical Engineer |
|
Responsibility |
· |
Coordinate & Supervise Basic and Detail Engineering Design for new facilities (green field), modification work for existing facilities (brown field) which cover: site surveys, review the modification of P&ID and PFD. |
|
|
· |
Check & Review Engineering Deliverables: Equipment List, Equipment Selection and Specification Review, Equipment Layout Study, Material Handling Study, Equipment Data Sheets, Cost Estimation and EPCI Schedule. |
|
|
· |
Prepare Manpower Loading and Man-hour Cost Estimation. |
|
Work Orders |
1. |
Crude Oil Pump Optimization. |
|
|
2. |
Fired Heater Burner De-botlenecking. |
|
|
3. |
Mercury Removal Unit Installation. |