2007-2010 |
|
Tripatra Engineers & Constructors (TPEC) |
|
Project |
|
Blanket Engineering Service for PHE ONWJ |
|
Position |
|
Sr. Mechanical Engineer |
|
Responsibility |
· |
Coordinate & Supervise Engineering Design for new facilities (green field), modification works for existing facilities (brown field) which cover: site surveys, review the modification of P&ID and PFD. |
|
|
· |
Check & Review Engineering Deliverables: Equipment List, Equipment Selection and Specification Review, Equipment Layout Study, Material Handling Study, Equipment Data Sheets, Cost Estimation and EPCI Schedule. |
|
Work Orders |
1. |
FEED for Bravo Control System Retrofit. |
|
|
2. |
Feasibilty study for KLA Compressor Installation. |
|
|
3. |
Detail Long Term Solution for JJA-KILO Reactivation. |
|
|
4. |
Zulu Reactivation. |
|
|
5. |
Appraise & Select Stage Study of Installation Electric Heater at OWTP. |
|
|
6. |
FEED for Pump Replacement for Mike-Mike F/S. |
|
|
7. |
FEED for Pump Replacement for Foxtrot F/S. |
|
|
8. |
Feasibilty study for Echo Pump Replacement. |
|
|
9. |
Datasheet Standardization for PHE ONWJ. |
|
|
10. |
FEED for Echo Compressor Control System Upgrade. |
|
|
11. |
Engineering Specification for PHE ONWJ. |
|
|
12. |
Engineering Study for Uniform Jockey Pump. |
|
|
13. |
Bravo B1C Trim Cooler Replacement. |
|
|
14. |
NGL Fire Water Study. |
|
|
15. |
LB Venting Re-route Engineering Package. |