Employed for my skills in System Test, standards, procedures and methodologies, my initial task was to assist in correcting the existing system test procedures, and re-engineer the System Test environment into a more manageable approach.
Project
PHOENIX is a front-end PC-LAN based system with IBM mainframe interfaces.
Produced
initially from a software designer tool as a prototype system and reworked into
a functional User Interface Client software system, the task of the testing team
was to organise testing for the entire project.
Employed
for my skills in System Test, standards, procedures and methodologies, my
initial task was to assist in correcting the existing system test procedures,
and re-engineer the System Test environment into a more manageable approach.
A.T.& T. International is a major American telecommunications company providing software solutions for Telecom Australia (now Telstra).
I proposed, designed and created software systems to encompass the necessary testing standards, procedures, and methodologies that would provide for:
|
The online data entry of Test Specifications, included business requirements traceability back to the business rules and functional requirements as specified by Telecom Australia. | |
|
The online scheduling of Test Cycles and Test Runs. | |
|
An online interface to execute scheduled Test Cycles (interfaced to MS Test automated regression software tool). | |
|
Capture and archive test results from executed Test Cycles. | |
|
Automated Status, statistical, and metrics reporting. | |
|
Automated link to Problem Management for reporting of test failures. |
Created the following systems using MS Access:
| Test Specification system for the online data entry of Test Specifications | |
| Test Execution and Reporting system, linked to the Test Specification system and the MS Test regression test tool. |
As a result of the completed software systems, the following advantages have now been realised for the project:
|
A project-wide common standard, format, and procedure for the testing environment | |
|
The standards, procedures, and methodology are built into a software system and cannot be circumvented. | |
|
Standardised reporting format. | |
|
An easily understood testing strategy and approach. | |
|
Accurate focus on testing activities | |
|
Changes to Test Specifications require minimal re-work and re-testing. | |
|
Cross-reference between MS Test test script programs and Test Cases and Test Conditions to provide sufficient functional and technical information | |
|
Provides business requirements traceability | |
|
Incomplete testing can be identified and corrected | |
|
Duplicated testing can be identified and removed if necessary | |
|
Automatic test results archive can provide management with statistical, metric, and status data to assess the testing progress. | |
|
Testing is seen as an integral part in delivering a quality product. |