Arab Center for Engineering Studies [ June ` Aug 2000 / Amman, Jordan ]
- This was a three months training as a graduation requirement.
- Arab Center is one of the leading companies in Engineering Studies in the Middle East.
- Main responsibilities included:
- Site Investigation and Some Geotichnical Studies.
- Testing of Construction Materials.
- Quality Control & Special Studies.
Structural Laboratory (JUST) [ Feb. ` June 2001 / Irbid, Jordan ]
- This was a Part of Students' Employing Program in Jordan University of
Science and Technology at Civil Engineering Department.
- Main responsibilities included:
- Main Tasks were Assisting Ph.D and M.Sc. Students Researches.
- Performing Different Labs' Experiment in the Structural Laboratory.
Consolidated Consultant for Engineering & Environment
[ July 2001 - Aug. 2003 / Amman, Jordan ]
Infrastructure Design Engineer
- Consolidated Consultant is one of the leading companies in Engineering and Environment Studies in the Middle East.
- Main responsibilities included:
- Hydrological Studies.
- Infrastructure Networks design.
Major Projects
- Rehabilitation and Expansion of water Networks in Ma'an & Tafeileh Governorates.
The project includes preparation of the hydraulic design for both governorates in phase 1 of the project and preparation of detailed designs for five areas within the project area.
- Design and Construction Supervision
of Wastewater Collection and Treatment System in Greater Irbid-Stage II - Wadi Shallaleh.
'The project is carried out in association with Fichtner Company - Germany'
Detailed design of sewer networks and house connection for 11 communities in Irbid, in addition to the
design of the trunk sewers, the treatment plant and the effluent reuse conveyor to North Jordan Valley.
the total length of sewer networks is 510 km with pipe diameters ranging between 200 mm and 500 mm.
the length of the trunk sewers is 45 km with pipe diameters varying between 400 mm and 900 mm.
the length of the effluent pipeline is 25 km with diameter varying between 600 mm and 800 mm.
the treatment plant capacity in year 2025 is 22,000 m3/day.
The construction cost of the project is 55 million Jordanian Dinar (77 Million USD).
The project serves about 130,000 inhabitants in
the eastern area of the project, which is expected to arise to 240,000 in year 2025 and 22,000 in
the eastern area. The eastern area will be drained toward the new WWTP, while the western area to
the existing Wadi Arab WWTP.
- Infrastructure network Design for The New Shallaleh Neighborhood-Aqaba.
Responsibilities included the design of the water supply,Irrigation Main Line, wastewater networks and Storm water network for
the Shallaleh Neighborhood with an area of 500 dunums.
- Population Dynamics Study and Four Studies for Monitoring,
Assessing and Quantifying Environmental Damages to Water, Agricultural Resources, Terrestrial and Marine ecosystems.
As direct result of the Gulf Crises about 1.4 Million refuges entered Jordan between 2nd August 1990 and the 1st September 1991.
This sudden increase in population has affected Jordan National Resources and caused some damages. The project is concerned with
monitoring, assessing and evaluating the damages to Jordan National Resources and translate these damages into economic term to
define the amount of Jordan is entitled to whether for the damages themselves if can be restored or compensation for everlasting damage.
- Cesspit Survey project in Jerash
This project is to identify the protective measures to prevent pollution of seeping wastewater to Qairawan water spring which is used for domestic water supply.
- Regional Data Bank - Phase III.
'This project was carried out in association with BRL Engineers Company - France'
This project is a regional pilot project for time critical hydrological data acquisition and
transmission; it includes the installation of different metrological station around the country.
Our company was the subcontractor for the client " Ministry of Water & Irrigation" and it was
in charge of designing infrastructures and civil works for the equipments to be installed and to
assist French experts during site installation.
- Wastewater Networks for Amman Housing - 1
Duties included the design of wastewater network for a population of 5,200; during this project my
main responsibilities were designing the layout and profile for the sewer lines of 3.0 Km lengths.
- King Hussein University.
The project includes the infrastructure design for King Hussein University-Jordan.
My duties included the design of water supply. wastewater and storm drainage networks for the mentioned project.
- House of Representative [ Sana'a ` Yamen ].
'This project was carried out in association with labmeyer International Company - Germany'
This project is a regional pilot project for time critical hydrological data acquisition and
transmission; it includes the installation of different metrological station around the country.
Our company was the subcontractor for the client " Ministry of Water & Irrigation " and it was
in charge of designing infrastructures and civil works for the equipments to be installed and to
assist French experts during site installation.
- Hazard Wastes Highway.
The project includes the supervision on the Hazard Wastes Highway, Which is a (48 Km) highway located at the
south of Jordan. My duty was to check the hydrological study and analysis, and to do the appropriate hydraulic design for the last 28 Km of the mentioned highway.
- Yajous Highway.
My duty was to Prepare the hydrological study and analysis, and to do the appropriate hydraulic design for 46 Km of the mentioned highway.