UEO Excalibur ASV 7100
Technical Readout


Ship Name:
UEO Excalibur ASV 7100

Class:
UEO seaWolf-class Advanced Submergence Vessel

Designed By:
Vice Admiral Nathan Bridger,
Cmdr. Lucas Wolenczak,
Lt.Cmdr Michael Warren,
Alex Grayson (Grayson Enterprises).

Project Cost:
Still unknown.

Length:
412m

Beam:
47m

Height:
83m

Submerged Displacement:
240,000 tons

Hull Composition:
Triple-layered, pliant, semi-organic, accelerated self-regenerating bio skin, Titanium double-layer inner hull and support frame.
25m retractable reconnaissance tower.

Propulsion:
Grayson/Yutani fusion reactor, Type R77, powering 4 aqua-return turbines,
AMJ (Aqua Manoeuvring Jet) thrusters,
�Caterpillar� emergency navigation drive.

Weapons Systems:
Conventional:
30 torpedo tubes, armed with Mk 94 variable charge EM plasma torpedoes, and prototype Mk C1 plasma cluster torpedoes.
6 high density, long-range lasers,
10 medium-range lasers,
19 short-range lasers,
1 EM pulse cannon (bow-mounted).

Nuclear:
12 Pathfinder long-range missiles, 4 megatons each.

Defence Systems:
Mark XII intercepting torpedoes,
Grayson Enterprises GRD-1 countermeasure system,
A-WSKRS EM defence system.

Utilitarian Systems:
Magnetic Grapnel Torpedoes.

Computer System:
Intel/IBM "Bigger Blue�, Near Human AI

Sensors:
Internal:
Hypersonar, effective range 175km.

External:
15 A-WSKRS, with aerial capability of 1km.
3-5 on station at one time (5 required for EM defence field).
Mother (Roving),
Junior (typically bow),
Loner (typically stern),
up to 2 re-assignable.
HR Probe - GR-HR-42

Top Speed:
270 kph standard cruising,
320 kph maximum.

Crush Depth:
10 000 m/ 32 800 ft

EVA complement:
Sub-Fighters:
20 Spectre (SFA-2) class
15 Dauntless-class
10 Marauder-class
1 seaFox (sF-P1) (prototype aerial sub-fighter)

TeamCraft and support craft:
12 seaCrab II mini-subs
10 Trident-class seaLaunches
9 seaSpeeder II pursuit subs
8 Typhoon-class seaLaunches
4 "Stinger" high-speed submersibles
1 prototype Masada-class (stealth) seaLaunch

Crew compliment:
820 total:

80 officers
610 enlisted crew
130 scientific personnel/civilians

Construction chronology:

Class design submitted:
November 22nd, 2035.

ASV design modifications submitted:
March 3rd, 2036.

Keel laid - construction commenced:
May 12th, 2037, UEO Construction Facility, Alameda, San Francisco.

Construction completed:
August 29th, 2039.

UEO Commissioning Date:
October 21st, 2039.

Command history:
Commander Jacqueline Hawkins (24/8/2039-20/10/2039)
Captain Michael M.Warren (21/10/2039-present)

(Non-classified data taken from Jane's All the World's Fighting Ships-2039 Edition)

Readouts and displays:


Master situation display.

Interior shots:


Excalibur Docking Complex, Pearl Harbour


    Back to Technical page

Back to the main page
Hosted by www.Geocities.ws

1