| Deck Re-Core Page 2 |
| Before the yard could begin, I needed to remove the remaining deck hardware and stanchions. This included 3 deck fills, 4 chain plates and 2 genoa tracks. |
| After tapping the decks out, the guys found the area of moisture and delamination to be confined to both side decks between the chainplates and the cockpit. The top layer of glass was removed and the wet core was removed. New plywood core was epoxied into place and the top layer of fiberglass was epoxied on top |
| That was the easy part. Now the real fun begins ... |