The first summer:
This was after the body transformation, ie paint job.  All of my work was done at the maintianence garage of Schultz Electric in St. Joesph MO.  Thanks a million to Larry and Randy Schultz and of course Mr. Fischer!
Here is the first night that my "new" truck came home.  Isn't she beautiful!  The original color was the pea green with balck and crome side molding.  It ran on about 6 out of the 8 slugs.  But I coiuldn't resist.
The second summer:
In my second summer, Jamie Fischer (a friend from work), was so kind and allowed me to tie up his shop for about 3 weeks during the summer.  During which I re-built the 350 and the Rockwell transfer case.  It ran like a champ!
To return to my main page:
Hosted by www.Geocities.ws

1