2.1: An example of terrain model; different perspective views of digital elevation model

2.2: Saved cost with a GIS in the local government in the period of ten years

2.3: The flowchart for comparison of existing method with the method that GIS is used

2.4: Maps in the archive

2.5: Multiple copies of maps in copy center

2.6: The cost differences between two methodologies

2.7: Different views from the IGABIS

2.8: Digital natural gas pipeline network that superimposed Ikonus satellite images

2.9: Query of information about subscribers linked with geographical features

2.10: Production of digital maps

2.11: 1/200 scaled as-built plans that produced by IGABIS

2.12: Possibility of reaching geographical information through intranet

2.13: Online digital traffic watching system

2.14: The location of cameras in Istanbul and one view of camera

2.15: Query of geological maps through the Internet

2.16: Nearest route selection for the ambulance closest to the accident

2.17: Fire notification from one address in order to dispatch the fire vehicle

3.1: The preparation of base map

3.2: Preparation of the geological map

3.3: The collection of first priority information

3.4: The collection of secondary information

3.5: The preparation of synthesis map

3.6: The inquiry of macro-planning decision

3.7: Field survey

3.8: Preparation of pre-design plan

3.9: The colloquium and review in the control and approval phase

3.10: Final reviews before approval of the plan

3.11: Time schedule of plan-making process in the Bank of Provinces

3.12: Total duration for plan-making in the Bank

3.13: Methodology of preparing Çalapverdi Plan

3.14: Conceptual model for preparing the plan with GIS

3.15: Available digital layers at the beginning of analysis

3.16: Classified land use

3.17: Soil Types

3.18: Classified Soil Types

3.19: Protection Corridor of Irrigation Channel

3.20: 30m Buffer Corridor of Highway

3.21: Geological Structure of Settlement

3.22: Slope Analysis

3.23: Closeness to Commercial Center

3.24: Closeness to Transportation System

3.25: Closeness to Education Center

3.26: First Alternative

3.27: Second Alternative

3.28: Third Alternative

3.29: Final plan of Çalapverdi

3.30: The land use of Niksar Study Area

3.31: Database design of thematic layers

3.32: Examples for thematic maps, prepared in the Niksar Conservation Plan

Volkan Osman Kepoğlu

Kişisel Web Sayfama Hoşgeldiniz!!!

Master Tezim

List of Figures

BAKU - TBILISI - CEYHAN CRUDE OIL P/L PROJECT,

BOTAS PETROLEUM PIPELINE CORPORATION

 

Address: Bilkent Plaza A-1 Blok 1st Floor Room:129 06530 Bilkent Ankara/TURKEY

To contact me

GSM: +90 532 705 65 71

E-mail: [email protected]

 

Kentsel Tasarım Master programında “Türkiye’de Coğrafi Bilgi Sisteminin Kentsel Planlama Süreçine Katkısı” üzerine yaptığım tezi Eylül 2003 tarihinde tamamladım. Tez hakkında aşağıda daha detaylı bilgiye ulaşmak mümkün. İlgilenen arkadaşlar varsa ilgili bölümleri pdf olarak gönderebilirim. Örnek inceleme İller Bankası ve Özel Planlama Büroları üzerine yapılmıştır.

Hosted by www.Geocities.ws

1