MPR027 - GROUP 3 - BIKE PUMP PROJECT
THE PRODUCT THE PROCESS
SCHEDULE & WBS
GROUP INFO
HOME
GOALS
FINAL PRESENTATION
PROJECT DESCRIPTION

The purpose of this project is to design and build a
Product consisting of a minimum of five parts.  The product must be partly manufactured and assembled in a totally automated system containg a CNC Lathe and two robots, a Motoman UP-6 and a Hitachi A3020.  Our robot system or Cell, as its refered to, must be completely operational by December 10th.
View our final oral presentation including video clips of the cell.
LULE� UNIVERSITY OF TECHNOLOGY
University Campus, Pors�n, 97187, Lule�
Tel +46 (0) 920-91000 Fax +46 920-91399
[email protected]
THE PRODUCT
Get a full description of the product parts and functions.
Group Meeting
Some product and fixture prototypes.
QUESTIONS OR CONSERNS....
Leave us a message
SCHEDULE & WBS
Take a look at whats to came as well as a detailed description of our Work Breakdown Structure
THE PROCESS
Take a walk through the entire production process, start to finish, with video's and pictures.
Johan tells it all, without the drawings.
PRODUCT AND PROJECT GOALS
VIEW VIDEO OF ENTIRE CELL
Get a description of the group's goals for the product itself, as well as what they plan to get out of this project
2.2 M .avi file - may take a few minutes
GROUP INFO.
Meet the group members.
Hosted by www.Geocities.ws

1