Home
Skills
Acadmic Study
Professional Study
Major Projects
In Digimart
In Super Market
In Micro-Inn
Jobs Detail
Project Designs
Contect Info

 

In Digimart

 

 

1. Digimart Computers  (June 2000-Dec 2007)

 

Ø Networking:       (Wired, Wireless and VPN’s)

 

SSP Traffic Police office: Complete LAN networking of new and old buildings for about 75 plus nodes.

 

PMO by ITD: Complete designing and deployment of networking project of PMO (Near Dharampura Bridge) in 2 flor building of more then 100 nodes. Around 11,000 feet cable lay for both voice and data. Installation and configuration of Linksys manageable Gigabit Switches.  

 

Crescent Group: VPN between Lahore office and Karachi using linksys RV series routers with dual connectivity and redundancy and also ready for VPN tunnel from 50 plus mobile client’s using quick VPN application.

 

Total Gold:  VPN between Lahore office and Islamabad using linksys RV series and BEFX41 routers, also configured and ready for VPN tunnel from 50 plus mobile client’s using quick VPN application.

 

Manan Shahid forgings: Complete solution of internal LAN and connectivity of 3 plants via fibber optic and Wireless WAN.

 

NAB: Complete Wired and Wireless Solution for Chmaba House, 5 Club road, National Tower: 

Complete Solution of LAN in 5 buildings of Chamba House, 5 Club road, and National Tower with Diagram submit on 29th Aug 2007. Wireless WAN Solution for connectivity of 5 club road with Chamba house and National tower by VPN.

 

Bhawalnagar Wireless WAN Project:

Wireless Bridging between three building in point to multipoint scenario with Linksys bridges and High Gain Antenna’s. Complete LAN implementation of about 40 plus node with about 10,000 feet Cat5e Cable.   

 

Lahore City Garments (Solution):

Solutions of Point to multipoint Wireless Bridging, Video Conferencing, VoIP, video surveillance and BIO matrix.

 

Network Plan of Rupali textiles: (New building near Mall Road)

Complete Solution of wired network for over 200 nodes of 3 floor building.

 

Punjab Transport Department by ITD:(Information Technology Department).

Complete Wireless LAN of about 30 plus nodes with linksys Wireless products.

 

Honda (PVT) Ltd. Shekupura Factory:

Working on a Fibber optic project, the project is required to deployment of Cisco and Linksys Advance Manageable switches. One long distance wireless link with wireless zone in both building also part of this project

 

NCHD Islamabad: (National commission human development )

Complete designing and deployment of networking project of NCHD in Shaheed-e-millat building Islamabad of more then 300 nodes. Around 31,000 feet cable lay for both voice and data. Installation and configuration of VLAN and Port trucking on Linksys manageable Gigabit Switches.  

 

Agriculture Secretariat Department government of Punjab By ITD:

Currently working on complete designing and deployment of networking project of Agriculture Secretariat Department  and water and management training Institute, Agriculture department located near Thokar Niaz baig.

 

C & W Department government of Pakistan By ITD:

Complete Network deployment of 5 floor building near Choobugi Lahore.

 

Law & Education Department, ITD, Government of Punjab:

Build a network with CISCO-LINKSYS Switches of “Capacity Building Project” in Law & Education Department, ITD, Government of Punjab

 

Sui Northern Gas Head Office:

Complete networking of First Floor of Sui Northern Gas Head Office at Egerton Road. This project was done on a turn-key basis and apart from the supply of networking materials, it included cable laying, ducting, pruning and configuration of their network

 

LUMS (Lahore University of management and Science):

Installation and Configuration of Maxtor NAS (network Access Storage) Drive with implementation of Raid 1 and Raid 5.

 

Honda  (PVT) Ltd.:

Resolve compatibility issue of Linksys SRW224 manageable switch with Xerox 8830 plotter.

 

MM Pakistan:

Full Network with 100 base switches. Installed using “Star Topology, Server 2000 Server with Domain and Proxy 7 mail Server. And complete file and print sharing.

 

Suraj Cotton Mills & Shams Cotton Mills Head Office:

Complete network configuration of Suraj Cotton Mills & Shams Cotton Mills Head Office including supply of complete networking equipment and Intel based Pentium III workstations.

 

Punjab group of Colleges:  (PCBA, Punjab college of law, Punjab college of commerce, etc)

Complete setting up of Cresset College Lab based on Intel Pentium-4 Workstations with complete networking in Punjab College of law.

Cresset College:

Complete setting up of Cresset College Lab based on Intel Pentium III Workstations and supply of Networking Equipment

 

Ø      Wireless project:

 

Support and Service: 

Providing my services and support in all over Pakistan for Linksys Wireless network products following products:

(Wireless Access Points, Cable and DSL routers, wireless Network Adapters, print Servers, Wireless Bridges, and Network Storage, Etc)

 

Wireless Zone:

Created many wireless and wired networks for many companies and individuals. And telephone support in all over Pakistan for wireless networking using Linksys wireless routers and access points.

Some of my clients are:-

1-Moonu House:  2-Segul House:  3-Hair plantation:  4-Oxford Library Karachi:  5-Metro sourcing,: 6-Chicago Grill restaurant: 7- Football factory in Sialkot:

 

Ø Servers & workstation:

 

Prime Commercial Bank Ltd.

Assembled Intel Servers for their banking and online services etc. Servers were based on Intel motherboards SBT2, SAI2, SE7501HG2, SE7501BR2, with Xeon single and dual processor with original Intel and third party Chases.  Also providing doorstep support service for installed Servers

Eastern Group:

Installed & configured Server based on Intel SE7501BR2 with Xeon 2.4Ghz dual processors, SCSI hard disk along with raid options.

 

Irfan Textiles

Supply of L440GX+ based Server, 2 Dual STL2 based Servers and Pentium III Workstations for re-cuperation of Irfan Textiles (Pvt) Limited Unit I, Irfan Textiles (Pvt) Limited Unit II and Irfan Foods (Pvt) Limited. This also included supply of Intel & D-Link networking equipment.

 

Matt McDonald Pakistan

Setting up of GIS Lab of Matt McDonald Pakistan which included various P4 systems for their Graphic Workstations and a Dual Intel STL2 based Server.

 

Ø Network with Proxy and mail server setup:

 

Zainal Textiles (PVT.) Ltd.

Domain Level POP3 and SMTP Mail Server

 

Network Installation and its set up using “Star Topology” (Windows NT Server/ Windows 98 Workstations). Also provided basic training to users to operate Network and email.

 

Ace Cargo (PVT.) Ltd.

Full NT based Network including Mail server for internal and external mail, Microsoft Outlook     Express and Word client, CSM Proxy Server  internet sharing.

 

Nadia Textiles (PVT) Ltd.

Full NT based Network with 100 base switches. Installed using “Star Topology,POP3 and SMTP Mail Server (Windows NT Server/ Windows NT   Workstations). Also provided basic training to operate Network and Mail.

 

Ø Setup for Internet via Satellite:

I have done many setup internet Via Satellite with Microsoft ISA Server, for  many corporate clients and Specialty for Internet cable Service providers in Lahore, Gujranwall, Bahwalpure, Multan Etc.

 

 

 


Last modified: Wednesday 9 January 2008

 

 

Hosted by www.Geocities.ws

1