| 2002 |
 |
Big Betty is Finished |
 |
Big Betty's Paint Rig |
| 2001 |
 |
Nikita Working on the Parachute |
 |
Katera Working on the Parachute |
 |
Rig for gluing balsa wood fins onto Big Betty's fuselage. |
 |
Rig for gluing the launch lug onto Big Betty's fuselage. |
 |
Heatseeker before launch |
 |
Loading an engine into Code Red |
 |
Mongoose Launch Mission Control |
 |
Looking for the Lost Mongoose 2nd Stage |
 |
Loading an engine into the Snitch UFO |
 |
Loading an engine into the Snitch UFO |
 |
Rattler-7 launch video. |
 |
Heatseeker Missile launched Spring 2001. |
|
Heatseeker Missile |
 |
Flash & Mosquito to be launched spring 2001. |
|
Skywinder Rocket |
| 2000 |
 |
Rattler-7 Box End. |
 |
Navy Missile Unstable Flight Simulation. |
 |
Rattler-7 and its junior launch crew. |
| 1999 |
 |
Lee and I posing with the Navy Missile before its maiden flight. |
 |
Navy Missile ready to launch. |
|
Navy Missile blasting off. |
|
Preparing to launch the Army Missile. |
 |
Army Missile ready to launch. |
 |
Rocket Workshop |
|
The Rocketeers posing before an afternoon of rocket flying. |