David assembling the frame for the wall extension above the office.
|
|
David still working away, with the dojo in the background.
|
|
The office wall, before we put up the extension.
|
|
A nice view of Brad's armpit as the extension is put in place.
|
|
David trying to get another look at Brad's armpit.
|
|
The dojo fridge, with mandatory after-construction beer.
|
Next
Home or Page 1 2 3 4 5 6 7 8 9 10 11
Previous
|
| | |