Timeline




Oct 16-22 Finish design, cut plexiglass frame, construct base. Order additional materials.

Oct 23-Nov 1 Assemble trebuchet.

Nov 2-7 Take videos, varying arm lengths and masses.

Nov 8-14 Analyze data with VideoPoint and IGOR

Nov 15-21 Take more data if needed, otherwise, discuss design modifications based off of analysis.

Nov 22-End Complete any design modifications (possibly including flexible throwing arm), compare our specs for maximized range with medieval trebuchet designs.


[Home] [Pictures] [How It Works] [Links]

Hosted by www.Geocities.ws

1