In 2005, the most current project was started that will expand the kitchen, add a new entry foyer and rear laundry room. The entire exterior will be modified with a wrap around porch, a stamped concrete patio off the kitchen and 2 second story porches.

The kitchen and master bedroom will each have 12 feet of glass doors leading to the patio and second story porch off the master bedroom.
Artist sketch. 2nd story porch from master was added after this drawing...
Side view of house before start of exterior project...
Pouring the patio off the kitchen...
Getting the foundation started...
Patio and rear addition roofs coming along...
Stamped concrete patio...
Double French sliders and windows installed...
Enclosed rear addition that includes new laundry room...
August 11th, 2005.
Second story master bedroom porch roof is framed.
October 1st, 2005.
French sliders are installed in 2nd story master to porch.
Porch is extended toward front of house and corner gazebo added.
September 17th 2005.
NEW views from 2nd story Master Bedroom porch...
Bob and Tim doing some serious planning...
2005 Master Bath and Bedroom Project
New second story master bath and shower completed in June 2005.
In late 2003, we renovated the bathroom, hardwood floors and most of the walls in the farmhouse.
Old panels were stripped from the kitchen and new drywall installed.
The stairs and hall walls were repaired and all the hardware floors were sanded and refinished to the look of days gone by...