Photos from the project - Construction of the panels
031_Screwing_motion.jpg
First a wooden frame is built.
032_Screwing.jpg
The electrical screwdriver was a good help for that.
033_Screwing_action.jpg
Overview - analysis - action. Peter at work.
035_Sawing_closer_again.jpg
The frame is filled with thermal insulation - Rockwool.
036_Sawing_in_another_world.jpg
Peter is blessed with the ability to look as if he is from another planet.
040_Electrical_box_foil_view.jpg
On top of the insulation, the heating foils are placed.
041_Electrical_box_adding_wires.jpg
Connecting the electrical wires must be done carefully.
042_Hammering_smiling.jpg
The foils are fastened to the frame.
045_Planing_batten_is_being_leveled.jpg
The frame is planed
046_Planing_big_smile.jpg
Gregers enjoys the work.
050_Nailing_overview.jpg
Finally the covering is added.
051_Nailing_overview_again.jpg
We used an eletrical "clamp gun" which was a huge improvement from using a regular hammer.
052_Nailing.jpg
Precision and care was observed at every step of the proces.
030_Innocent_looking_Gregers_before_his_deadly_construction_work.jpg
Gregers in the workshop while we made the panels.



[ Previous ] [Next ] [Main page]
Hosted by www.Geocities.ws

1