Home | Story | Layout | Construction | Structures | Fiddle Yard | Pictures | Animations | Snow Clearing | Links


Train operations

Belvédère is operated according a train sequence which was extracted out of the 1982 summer time table, the last time trains were running on the old Furka line. I try to represent a day's operation with the typical train compositions found running on the line.

5.1. Train rooster

5.1.1. Locomotives

 

 

 

 

 

 

 

5.1.2 Coaches

 

 

 

 

 

 

 

5.1.3. Goods carriages

 

 

 

 

 

 

 

 

5.2. Track layout

Every spot position on the layout carries its particular code which is refered to in the sequence list when switching moves are described.

5.3. Goods traffic

Here is a list of all the transported goods on the line and which type of waggon is used to convey them:

 

 

 

 

 

5.4. Time table sequence

A list with all the train sequences containing all the necessary information is used for the operation. The list is self explainatory and is enclosed herewith. Train numbers in italic mark special trains:

Train No. Obw. Bel. Muttb. Composition Remarks
  arr. dep. Tr.  
6004 05:40 05:51 05:53 1 06:02 HGm 4/4(62)+Gbv(4436) Early morning service train for line checks after heavy thunderstorms the evening before.
218 07:40 07:51 07:53 1 08:02 - -
220 08:18 08:29 - 2 - HGm 4/4(62) Engine from Brig arriving in Belvedere for the goods trains to the construction site. Switching moves G2->G3c.
121 09:37 09:23 - 2 09:11 HGm 4/4II(102)+A4270+B2285+B2285

+Bt2253

Regional Train Andermatt - Brig
130 09:08 09:19 09:23 1 09:32 HGm 4/4I(31)+A4065+B4270+B4268 Regional Train Brig - Andermatt
22 - - 09:51 1 10:00 HGm 4/4(62)+Fad4855 Gravel block train; has previously been loaded at the silo. Switching moves G3c->G2.
21 10:29 10:14 10:14 2 10:03 - -
20 10:03 10:14 10:16 1 10:25 HGm4/4I(31)+A4065+B4270+B4268+D4342 Fast train Brig - Disentis
25 - - 11:08 2 10:56 HGm 4/4(62)+Fad4855 Gravel block train; to be loaded at the silo. Switching moves G2->G3c.
10030 10:57 11:08 11:10 1 11:19 HGm4/4II(2)+Haik-v2472+Uce4863+Uce4865 Goods train to construction site.
30 11:27 11:38 11:40 1 11:49 HGe 4/4I(37)+AS4022+AS2011+AS4024

+AS4014

Glacier Express A.
135 12:15 12:01 12:01 2 11:49 HGe 4/4I(31)+A4065+B4270+D4342 Regional train Andermatt - Brig
146 12:15 12:27 12:27 1 12:37 HGe 4/4I(31)+A4065+B4270+D4342 Regional train Brig - Andermatt
10033 12:42 12:28 12:28 2 12:16 HGm4/4II(2)+Gbv4436+Ek2511 Goods train from construction site (empty).
33 13:03 12:49 12:49 1 12:37 HGe 4/4I(37)+AS4022+AS2011+AS4024

+AS4014(-WR3813)

Glacier Express E: uncouple WR3813 from end of train and spot it to G2A.
40 13:07 13:18 13:20 1 13:29 HGe 4/4I(37)+AS4022+AS2011+AS4024

+AS4014(+WR3813)

Glacier Express B: WR3813 at G2A needs to be attached to end of train.
35 13:34 13:20 13:20 2 13:08 HGm 4/4II(102)+A4270+B2285+B2285+

Bt2253

Regional special Andermatt - Birg.
145 14:09 13:55 13:55 2 13:43 HGm 4/4II(102)+A4270+B2285+B2285+

Bt2253

Regional train Andermatt - Brig
41 14:35 14:14 14:21 2 14:03 - -
154 14:09 14:21 14:21 1 14:30 HGe4/4I(37)+A4065+B4270 Regional train Brig - Andermatt
549 14:52 14:43 14:43 2 14:31 - -
43 15:31 15:11 15:16 2 15:00 HGe 4/4I(37)+AS4022+AS2011+AS4024

+AS4014

Glacier Express F.
50 15:05 15:16 15:18 1 15:27 HGe4/4I(31)+A4065+B4270+D4342 Fast train Brig - Disentis
153 16:04 15:50 15:50 2 15:38 HGe4/4l(37)+A4065+B4270 Regional train Andermatt - Brig
52 15:35 15:46 15:49 1 15:59 HGm 4/4(62)+Fad4855 Gravel train from silo (switching move G3c->G1) to construction site
51 16:44 16:30 16:27 2 16:16 HGm 4/4(62)+Fad4855 Gravel train (empty) to silo (switching move G2->G3c)
262 16:17 16:29 16:29 1 16:38 - -
53 17:17 17:02 17:02 2 16:50 HGe4/4I(31)+A4065+B4270+D4342 Fast train Disentis-Brig
58 16:46 16:57 17:01 1 17:10 - -
55 17:44 17:28 17:28 2 17:18 HGe 4/4(62) Engine for construction site goods trains goes back to Brig
170 17:16 17:28 17:28 1 17:37 HGe4/4I(31)+A4065+B4270+D4342 Fast train Brig-Disentis
176 18:23 18:35 18:35 1 18:44 HGm 4/4II(102)+A4270+B2285+B2285+

Bt2253

Regional train Brig - Andermatt
63 19:21 19:06 19:06 2 18:54 HGe4/4I(31)+A4065+B4270 Regional train Andermatt - Brig

 

5.5. Practical operation

The basic compositions are already arranged on the 4 available cassetts in the fiddle yard:

 

Engines have their own shorter cassetts.

It is only a matter of arranging the cassetts at the right exit and trains can then be despatched.

For the use on the empty cassette or for adding coaches to existing compositions I use a little ramp which fascilitates the rerailing of waggons on the tracks.

 

 


Home | Story | Layout | Construction | Structures | Fiddle Yard | Pictures | Animations | Snow Clearing | Links

1