 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
|
Laminate Floor Installation |
|
|
|
 |
|
|
|
Recently we removed the "booth" dining area from our slide and moved the sleeper sofa to its position. We then put the end table from the rear of the coach (We were able to remove this because of the Shore Power Cord conversion done earlier), along with one of the recliners in the slide. I purchased a dining table from a our dealer that had been removed from a HR Presidential and placed it in the Bay Window area at the rear of the coach. This area was carpeted and we decided we wanted laminate flooring under the table. Having found a really good deal on laminate flooring at our local BJ's Wartehouse we decided to cover the entire galley, living room and new dinette area. |
|
|
|
 |
|
|
|
 |
|
 |
|
|
|
|
|
|
|
|
The cover over the in-coming city water connection and fresh water tank fill is removed and carpet is removed from floor. |
|
|
|
 |
|
|
|
 |
|
 |
|
|
|
|
|
|
|
|
The carpet and linoleum is removed from galley and the first two courses of laminate laid against the slide mechanism. |
|
|
|
 |
|
 |
|
|
|
Flooring is laid in new dining area and in front of the door. A cutout is made for the heat vent. |
|
|
|
 |
|
|
|
 |
|
|
|
|
 |
|
|
|
|
|
|
|
|
The flooring is cut around the galley area and the entire floor is covered. A new cabinet is built to cover the in-coming water connections. |
|
|
|
 |
|
|
 |
|
|
 |
|
|
|
|
|
|
|
|
New dining table installed, cabinet over water lines is finished and quarter round trim is in place. View of floor with new living room arrangement. We only have one recliner but have 5 Oak folding chairs with the new dinette which expands to seat 5 people. New cabinets are built in each end of the slide to hold folding oak dining chairs. |
|
|
|
 |
|
|
|
 |
|
|
|
|
|