| Operations - Page 3 | |||||||||||||||||||
| 4) H/N-5 11 AM Local Freight from Hudson Staging (track 1) to Arrival/Departure Track (A/D) track (southbound main) at Buttonwood Yard (crossover from northbound main required). Switch empty hoppers to track 4 for delivery to Loree Mine in Plymouth. Switch mixed freight to track 7 to make up continuation of H/N-5. Change engine and caboose from D&H to PRR. Proceed to Northumberland (track 3); pickup/drop off at Nescopeck (if desired). |
|||||||||||||||||||
![]() |
|||||||||||||||||||
![]() |
|||||||||||||||||||
| D&H Local enters Buttonwood Yard. Is cut off from it's train and goes for serviceing | |||||||||||||||||||
![]() |
|||||||||||||||||||
![]() |
|||||||||||||||||||
| PRR L1 rides the Turntable. Taking over the southbound local, it drops a couple boxcars at Nescopeck | |||||||||||||||||||
| Page 4 | |||||||||||||||||||
| Back to Page 1 | |||||||||||||||||||
| Home | |||||||||||||||||||