Operations - Page 3
4) H/N-5 11 AM Local Freight from Hudson Staging (track 1) to Arrival/Departure Track (A/D) track       (southbound main) at Buttonwood Yard (crossover from northbound main required).
    Switch empty hoppers to track 4 for delivery to Loree Mine in Plymouth. Switch mixed freight to         track 7 to make up continuation of H/N-5.  Change engine and caboose from D&H to PRR.                  Proceed to Northumberland (track 3); pickup/drop off at Nescopeck (if desired).
D&H Local enters Buttonwood Yard.  Is cut off from it's train and goes for serviceing
PRR L1 rides the Turntable. Taking over the southbound local, it drops a couple boxcars at Nescopeck
Page 4
Back to Page 1
Home
Hosted by www.Geocities.ws

1