Operations - Page 4

2) N/H-2 10 AM Through PRR Freight from Northumberland (track 2) to Hudson (track 2).
3) H/N-3 10 AM Through PRR Freight from Hudson (track 2) to Northumberland (track 2).
4) H/N-5 11 AM Local Freight from Hudson Staging (track 1) to Arrival/Departure (A/D) track                    (southbound main) at Buttonwood Yard (crossover from northbound main required). 
    Switch empty hoppers to track 4 for delivery to Loree mine in Plymouth.  Change engine and                   caboose from D&H to PRR. Switch mixed freight from track 7 to make up continuation of H/N-5.           Proceed to Northumberland track 3; pick up/drop off at Nescopeck if desired.
5) N/H-4 11:30 AM Local PRR Freight from Northumberland (track 3) to A/D track (Southbound                Mainline) at Buttonwood.  Pickup/drop-off at Nescopeck, and Nanticoke as desired. 
    Switch mixed freight for Plymouth, Wilkes-Barre and CNJ interchange to appropriate tracks.  Change       engine and caboose from PRR to D&H at Buttonwood.  Switch loaded hoppers on track 6 to N/H-4          for New England.  Proceed to Hudson Staging (track 1).  Swap loaded hoppers for empties at Loree.
6) Anthracite Express: 4 PM Mon-Fri Short passenger train returns from Philly (staged on Nescopeck           Branch) via Northumberland to Wilkes-Barre staging (track 4).
    Mountaineer: 4 PM Saturday and Sunday Southbound Passenger Train from Wilkes-Barre Staging            (track 3) (Pocono Resorts) to Philadelphia via Northumberland (track 1).

Second Shift:
7) N/N-6 5 PM Loaded Hoppers from Northumberland to Pennsylvania Power and Light (PP&L) at              Nanticoke (use Honey Pot Yard as needed).
8) N/N-7 6 PM Empties from P P&L to Northumberland.  Swap Empties for Loads.
9) P/L run Plymouth local to Loree with empties and pickup loads and deliver/pickup mixed freight.
10) A/L run Ashley (CNJ) local between Wilkes Barre industries and Buttonwood Yard (track 2)
Home
Hosted by www.Geocities.ws

1