| Operations - Page 4 | ||||||
2) N/H-2 10 AM Through PRR Freight from Northumberland (track 2) to Hudson (track 2). 3) H/N-3 10 AM Through PRR Freight from Hudson (track 2) to Northumberland (track 2). 4) H/N-5 11 AM Local Freight from Hudson Staging (track 1) to Arrival/Departure (A/D) track (southbound main) at Buttonwood Yard (crossover from northbound main required). Switch empty hoppers to track 4 for delivery to Loree mine in Plymouth. Change engine and caboose from D&H to PRR. Switch mixed freight from track 7 to make up continuation of H/N-5. Proceed to Northumberland track 3; pick up/drop off at Nescopeck if desired. 5) N/H-4 11:30 AM Local PRR Freight from Northumberland (track 3) to A/D track (Southbound Mainline) at Buttonwood. Pickup/drop-off at Nescopeck, and Nanticoke as desired. Switch mixed freight for Plymouth, Wilkes-Barre and CNJ interchange to appropriate tracks. Change engine and caboose from PRR to D&H at Buttonwood. Switch loaded hoppers on track 6 to N/H-4 for New England. Proceed to Hudson Staging (track 1). Swap loaded hoppers for empties at Loree. 6) Anthracite Express: 4 PM Mon-Fri Short passenger train returns from Philly (staged on Nescopeck Branch) via Northumberland to Wilkes-Barre staging (track 4). Mountaineer: 4 PM Saturday and Sunday Southbound Passenger Train from Wilkes-Barre Staging (track 3) (Pocono Resorts) to Philadelphia via Northumberland (track 1). Second Shift: 7) N/N-6 5 PM Loaded Hoppers from Northumberland to Pennsylvania Power and Light (PP&L) at Nanticoke (use Honey Pot Yard as needed). 8) N/N-7 6 PM Empties from P P&L to Northumberland. Swap Empties for Loads. 9) P/L run Plymouth local to Loree with empties and pickup loads and deliver/pickup mixed freight. 10) A/L run Ashley (CNJ) local between Wilkes Barre industries and Buttonwood Yard (track 2) |
||||||
| Home | ||||||