:: softwares ::
autocadd
mathcad
staadpro
turbo C++
sted
graphics tools
microsoft office tools
|
WORK EXPERIENCE
:: TRAINEE CAD DESIGNER (Civil Works Division)Filpinas Dravo Corporation, 1045 Aurora Milestone Bldg., Quezon City�  US Civil Works Project, March 2004 to Present Project output covers site grading, street improvement calculations and drawings, hydraulics and hydrology calculations for drainage design, and water and sewer aspects :: CIVIL ENGINEERamh Philippines, Inc., Ang Bahay ng Alumni Bldg., UP Diliman Campus, Quezon City�  Shell TM Kalaw, Luneta Stn. Structural Design, February 2004 Made structural design analyses for the canopy and a two-story building, conducted materials quantity take-off and drafted construction drawings. �  Shell C-5 � Do�a Julia Vargas Ave. Site Geotechnical Study, November 2003 Calculated bearing capacity; prepared the subsoil profile. �  SAMARIMA Resettlement Project, November 2003 Calculated hydrologic and hydraulic design parameters for drainage structures; drafted construction drawings; quantified all drainage items. �  Shell PDMB Site Geotechnical Study, October 2003 Analyzed the site�s liquefaction potential and settlement and consolidation; computed bearing capacity; prepared the subsoil profile. �  Shell SLT Site Geotechnical Study, September 2003 Prepared calculations for bearing capacity and settlement and subsoil profile. �  Miriam Grade School Footbridge Project, August 2003 Considered all civil works aspects for the development of the project including validations of existing structures. �  Miriam Thornton Road Widening Detailed Engineering, July 2003 Total civil works engineering: road and drainage designs, including Unit Price Analysis and Bill of Quantities. :: APPRENTICE CIVIL ENGINEER (Licensed)amh Philippines, Inc., Ang Bahay ng Alumni Bldg., UP Diliman Campus, Quezon City�  Miriam Campus Utility Study, May 2003 Conducted inventories and surveys for campus-wide utility systems and identified components needing physical rehabilitation. �  Miriam Library Media Center Geotechnical Study, March 2003 Performed UCT to determined compression strength; calculated bearing capacity; prepared the subsoil profile. �  Caltex Value Engineering, February 2003 Performed geotechnical analyses and design of reinforced soil wall; performed tests to determine the swell pressure for the site�s expansive soil. �  Petron Express Center 2 Pavement Investigation and Design, October 2002 Conducted 24-hr traffic counts; performed traffic analyses and forecasting; and ran calculations for the flexible and rigid pavement design. �  Mormon Churches Design Review, September 2002 Re-modeling and review of the impact of the new NSCP in the design of proposed Mormon Churches using STAAD III 22.0 W. �  Transmission Lines Relocation Study, August 2002 Formulated alternative alignment schemes and corresponding profiling of the transmission lines. �  Columbario de Sto. Ni�o Water Tank and Cistern Design, May 2002 Made a model using STAAD III 22.0 W and performed preliminary structural design calculations for Redoble Development Corporation. �  Villa Concepcion CW Project (San Juan, M.M.), May 2002 Design of site drainage; and calculated preliminary structural analysis for the proposed retaining wall and the 5-meter high firewall. �  CSC Toddler Room Detailed Engineering, Miriam College, April 2002 Design of drainage structures; and performed Unit Price Analyses; and conducted inspections during construction. �  Valley Golf and country Club Drainage Design, March 2002 Performed hydrologic study and preliminary hydraulic design calculations. �  Columbary Civil Works Project, February 2002 Performed hydrologic study and hydraulic design of drainage structures. �  Pedrosa Construction Assessment, January 2002 Post-construction quantity assessment survey of actual amount of material utilized for the construction. �  Miriam Campus Traffic Study, January 2002 Prepared the production of the Assessment Report, Draft Final and Final Solutions Report. �  Develops subsoil profiles from borehole logs
�  Location schematics of bolts for the Cross in the Church of Gesu (AdMU) :: GRADUATE ASSISTANTamh Philippines, Inc., Ang Bahay ng Alumni Bldg., UP Diliman Campus, Quezon City�  Miriam Campus Utility Study, September to November, 2001 Conducted inventories and surveys of utilities within the campus. Identified system components that need rehabilitation. Coordinated and facilitated meetings with the Client; and prepared reference maps. :: STUDENT ASSISTANTCivil Engineering Dept., College of Engineering, UP Diliman, Quezon CityAssisted faculty in the preparation of lecture notes, checking papers and other errands. :: LECTURER/TUTORAHEAD Tutorials, Katipunan Ave., Loyola Hts., Quezon CityTeaches various Mathematics subjects for College and High School entrance examinations. |