Picture posted October 10 Our pulpit area now has the baptistery installed. (Click on picture to enlarge) |
||||||||||
|
Picture posted September 22 Our baptistery and brick are here. (Click on picture to enlarge) |
||||||||||
|
Picture posted September 19 Sheet rock is going in.
Insulation goes in. (Click on picture to enlarge) |
||||||||||
|
Picture taken September 13 Our porch is up. (Click on picture to enlarge) |
||||||||||
|
|
||||||||||
|
Picture taken September 8 Our Steeple will look something like this. (Click on picture to enlarge) |
||||||||||
|
|
||||||||||
|
Picture posted August 27 Our Steeple will look something like this. (Click on picture to enlarge) |
||||||||||
|
|
||||||||||
|
Picture taken August 23 (Click on picture to enlarge)
|
||||||||||
|
Picture taken August 18 (Click on picture to enlarge) |
||||||||||
|
Picture taken August 17 |
||||||||||
|
|
||||||||||
| Overhang | ||||||||||
|
August 17
The arrows indicate some metal braces made to reinforce the overhang so it dose not sag.
|
||||||||||
|
|
||||||||||
| A Look Inside | ||||||||||
|
August 17
From left to right: - The pulpit area has been build up. - Part of the air conditioning is in as well as the window have been cut out. - The indirect lighting framing is up with additional fixtures for more light.
|
||||||||||
|
|
||||||||||
|