2005-2007 |
|
Tripatra Engineers & Constructors (TPEC) |
|
Project |
|
Blanket Engineering Service for BP West Java |
|
Position |
|
Sr. Mechanical Engineer |
|
Responsibility |
· |
Coordinate & Supervise Basic and Detail Engineering Design for modification works for existing facilities (brown field) which cover: site surveys, review the modification of P&ID and PFD. |
|
|
· |
Check & Review Engineering Deliverables: Equipment List, Equipment Selection and Specification Review, Equipment Layout Study, Equipment Data Sheets, Request for Quotation (RFQ) Packages, Technical Bid Analysis (TBA), Demolition & Installation Procedure. |
|
Work Orders |
1. |
Ardjuna Sakti Retirement – Mothballing Work Package |
|
|
2. |
Fire and Gas Upgrade for Mike-Mike Platform |
|
|
3. |
Modification of Oil Heater on AVSA Platform |
|
2005-2007 |
|
Tripatra Engineers & Constructors (TPEC) |
|
Project |
|
Engineering Services for Star Energy Kakap Limited (SEKL) |
|
Position |
|
Lead Mechanical Engineer |
|
Responsibility |
· |
Coordinate & Supervise Basic and Detail Engineering Design for modification works for existing facilities (brown field) which cover: site surveys, review the modification of P&ID and PFD. |
|
|
· |
Check & Review Engineering Deliverables: Equipment List, Equipment Selection, Specification Review, Equipment Layout Study, Equipment Data Sheets, Request for Quotation (RFQ) Package, Technical Bid Analysis (TBA), Cost Estimation, Demolition & Installation Procedure. |
|
|
· |
Prepare Manpower Loading and Man-hour Cost Estimation. |
|
Work Orders |
1. |
KRA Discharge Cooler Modification Project. |
|
|
2. |
KF Sales Gas Compressor Re-Wheeling Project |
|
|
3. |
Flare Tip Replacement for KRA, KF and KG Platform Project. |
|
|
4. |
Additional KF Booster Compressor Project. |
|
|
5. |
KG Platform Modification Project. |