2005-2007 |
|
Tripatra Engineers & Constructors (TPEC) |
|
Project |
|
Blanket Engineering Service for Kodeco Energy Co. Ltd. |
|
Position |
|
Sr. Mechanical Engineer |
|
Responsibility |
· |
Coordinate & Supervise Basic and Detail Engineering Design for new facilities (green field), modification works for existing facilities (brown field) which cover: site surveys, review the modification of P&ID and PFD. |
|
|
· |
Check & Review Engineering Deliverables: Equipment List, Equipment Selection and Specification Review, Equipment Layout Study, Material Handling Study, Equipment Data Sheets, Request for Quotation (RFQ) Packages, Cost Estimation and EPCI Schedule. |
|
Work Orders |
1. |
New Poleng Process Platform (PPP). |
|
|
2. |
Detail Engineering for Gas Expansion Onshore Receiving Facility (ORF). |
|
|
3. |
Detail Engineering for AW Platform Modification. |
|
|
4. |
FEED KE-23 Test Separator Skid. |
|
2005-2007 |
|
Tripatra Engineers & Constructors (TPEC) |
|
Project |
|
Engineering Support Services for ConocoPhillips Indonesia Ltd (COPI) |
|
Position |
|
Sr. Mechanical Engineer |
|
Responsibility |
· |
Coordinate & Supervise Basic and Detail Engineering Design for modification works for existing facilities (brown field) which cover: site surveys, review the modification of P&ID and PFD. |
|
|
· |
Check & Review Engineering Deliverables: Equipment List, Equipment Selection and Specification Review, Equipment Layout Study, Equipment Data Sheets, Request for Quotation (RFQ) Package, Demolition & Installation Procedure, Cost Estimation. |
|
Work Orders |
1. |
Matak Fuel Tank Replacement. |
|
|
2. |
Matak Fire Water System. |
|
|
3. |
Gas Compressor Study for Belida Platform and Hang Tuah MOgPU (Moveable Offshore Gas Production Unit). |
|
|
4. |
Sumatra Long Term Liquid Transportation Development. |
|
|
5. |
Ramba Kaji Pipeline Installation.. |