|
Scope of Work - Letang Tengah Rawa Optimization (LTRO) Project · The Letang, Tengah, and Rawa fields are three of eight gas fields located in the Corridor Block in South of Sumatra, Indonesia. Letang, Tengah & Rawa Fields are dedicated for the Chevron GSA. Rawa station is currently in operation, producing oil, and the compression system is currently used for gas reinjection. It is envisaged that the Rawa compression facilities has sufficient discharge head to deliver dehydrated gas to Grissik CGP. The gas outlet from the dehydration system will thus be diverted as sales gas instead of for gas reinjection. The total produced gas is then delivered to Grissik via newly built 12” gas pipeline. · The LTRO development scenario is to reactivate Letang Tengah wells and flowline (which had been shut-in since 2003, currently in mothballed condition). Reactivation of Letang and Tengah fields will also generate of condensate which will require additional liquid handling facilities to supplement the existing facilities installed at Rawa Station likes: install condensate stabilization unit & storage tank and upgrade safety / shutdown / utilities system at Rawa Station, tie-ins modification in Grissik CGP and Letang Tengah Station. |