Scope of Work - Sumpal Compression Project · The Sumpal Gas Station is part of the Corridor Block PSC (Production Sharing Contract), in South Sumatra. The Production forecast predicts that reservoir pressure will decline and consequently the gas production will start to decrease. In order to maintain gas production capacity, therefore a new gas compression facility is required to be installed and placed in operation. · For this purpose, the installation of new compression facilities, including its associated utilities system at Sumpal Gas Station, will be the main scope of work of Sumpal Compression Project. Sumpal Compression Project shall install one stage of compression station with 3 (three) Gas Turbine Driven compression trains. The drivers shall provide a total installed site rated horsepower of about 24,000hp. Each compressor train will consist of a suction scrubber, a compressor and an after cooler. · A common discharge scrubber will be used for the three of compression trains. The trains shall operate in parallel and share the gas load. Compressors will share common suction and discharge headers. In addition to compression system, the project scope will also include debottlenecking of the inlet product-ion manifold by installing additional inlet cooler and inlet separator · The existing produced water system shall be debottlenecked by this project. Other utilities such as electric power and instrument air will be also expanded to meet the needs of the new equipment. The existing fuel gas system shall be expanded to supply fuel to the gas turbine compressors and a new gas turbine generator. A new seal gas system will be provided to supply seal gas to the compressors. The flare system will be also debottlenecked. A new process control and electrical building will be constructed in the vicinity of the existing buildings and existing process control buildings shall be modified. |