Some of the new piles delivered from Belgium. They are 30 metres in length and were driven down into the seabed to a distance of fourteen metres. This depth allows for future dredging in this area. They were placed in rows of three and forty two rows were fitted. Some of the piles were fitted with stability angled bars.