LNG (Project II) Additional
24" Dia x 3.25 Km. Laying of Pipeline from U/S Valve Assembly at Balloki
Head Works to D/S Valve Assembly (Item wise indents)

For all indents Please click here


Sr. No.

Description

1. Main Steel Linepipe
2. Valves
3. W.N /Blind Flnage
4. S.I.O Ring
5. Stud Bolts
6. Factory Bend
7. P.F.I.J
8. Weldolets
9. Screwed Fittings
10. Pressure Gauge
11. Door Closure
12. Pig Signal
13. Weld Cap
14. Rubber Casing End Seal
15. Anchor Flange