If you want to buy the project management book mail [email protected]  for more details or call any of our book shops MUMBAI-22078296/97/022-22070989, KOLKATA-22826518/19 HYDERABAD-24756967,24756400,BANGALORE-25587923, 25584641,AHMEDABAD-26421611,BHATINA(PUNJAB)-2237387,CHENNAI-28410796,28550491,DELHI/NEWDELHI-23254990/91,23325760,26415092,24691288.If you want to write to the author directly email at [email protected]
 

Home

(B) Explanation of all process areas with goals and practices?

(A)Can you explain the process areas?

 

Note: - No one is going to ask such a question. But they would like to know at least the purpose of each KPA. Second they would like to know what you did to attain compatibility to these process areas. For instance you say that you did Organizational Process Definition. They would like to know how you did it. For instance you can justify it by saying that you made standard documents for coding standards which was then followed at the organization level for reference. Normally every one follows process it’s only that they do not know. So try to map the KPA to the process what you follow. The only purpose to paste all the KPA is if in case you are looking for some higher positions in big companies they really expect you to speak in term of KPA rather than generic term. This whole stuff can be like a quick reference for you before entering the interview room.

 

 Each process area is defined by a set of goals and practices. There are two categories of goals and practices: generic and specific. Generic goals and practices are a part of every process area. Specific goals and practices are specific to a given process area. A process area is satisfied when company processes cover all of the generic and specific goals and practices for that process area.

 

Generic goals and practices

 

Generic goals and practices are a part of every process area.

 

GG 1 Achieve Specific Goals

GP 1.1 Perform Base Practices

GG 2 Institutionalize a Managed Process

GP 2.1 Establish an Organizational Policy

GP 2.2 Plan the Process

GP 2.3 Provide Resources

GP 2.4 Assign Responsibility

GP 2.5 Train People

GP 2.6 Manage Configurations

GP 2.7 Identify and Involve Relevant Stakeholders

GP 2.8 Monitor and Control the Process

GP 2.9 Objectively Evaluate Adherence

GP 2.10 Review Status with Higher Level Management

GG 3 Institutionalize a Defined Process

GP 3.1 Establish a Defined Process

GP 3.2 Collect Improvement Information

GG 4 Institutionalize a Quantitatively Managed Process

GP 4.1 Establish Quantitative Objectives for the Process

GP 4.2 Stabilize Sub process Performance

GG 5 Institutionalize an Optimizing Process

GP 5.1 Ensure Continuous Process Improvement

GP 5.2 Correct Root Causes of Problems

 

 

 

Process areas

 

The CMMI contains 25 key process areas indicating the aspects of product development that are to be covered by company processes.

 

Causal Analysis and Resolution (CAR)

A Support process area at Maturity Level 5

 

Purpose

 

The purpose of Causal Analysis and Resolution (CAR) is to identify causes of defects and other problems and take action to prevent them from occurring in the future.

 

Specific Practices by Goal

 

SG 1 Determine Causes of Defects

SP 1.1-1 Select Defect Data for Analysis

SP 1.2-1 Analyze Causes

SG 2 Address Causes of Defects

SP 2.1-1 Implement the Action Proposals

SP 2.2-1 Evaluate the Effect of Changes

SP 2.3-1 Record Data

 

Configuration Management (CM)

A Support process area at Maturity Level 2

 

Purpose

 

The purpose of Configuration Management (CM) is to establish and maintain the integrity of work products using configuration identification, configuration control, configuration status accounting, and configuration audits.

 

Specific Practices by Goal

 

SG 1 Establish Baselines

SP 1.1-1 Identify Configuration Items

 SP 1.2-1 Establish a Configuration Management System

SP 1.3-1 Create or Release Baselines

SG 2 Track and Control Changes

SP 2.1-1 Track Change Requests

SP 2.2-1 Control Configuration Items

SG 3 Establish Integrity

SP 3.1-1 Establish Configuration Management Records

SP 3.2-1 Perform Configuration Audits

 

 

Decision Analysis and Resolution (DAR)

A Support process area at Maturity Level 3

 

Purpose

 

The purpose of Decision Analysis and Resolution (DAR) is to analyze possible decisions using a formal evaluation process that evaluates identified alternatives against established criteria.

 

Specific Practices by Goal

 

SG 1 Evaluate Alternatives

SP 1.1-1 Establish Guidelines for Decision Analysis

SP 1.2-1 Establish Evaluation Criteria

SP 1.3-1 Identify Alternative Solutions

SP 1.4-1 Select Evaluation Methods

SP 1.5-1 Evaluate Alternatives

SP 1.6-1 Select Solutions

 

Integrated Project Management (IPM)

A Project Management process area at Maturity Level 3

 

Purpose

 

The purpose of Integrated Project Management (IPM) is to establish and manage the project and the involvement of the relevant stakeholders according to an integrated and defined process that is tailored from the organization's set of standard processes.

 

Specific Practices by Goal

 

SG 1 Use the Project's Defined Process

SP 1.1-1 Establish the Project's Defined Process

SP 1.2-1 Use Organizational Process Assets for Planning Project Activities

SP 1.3-1 Integrate Plans

SP 1.4-1 Manage the Project Using the Integrated Plans

SP 1.5-1 Contribute to the Organizational Process Assets

SG 2 Coordinate and Collaborate with Relevant Stakeholders

SP 2.1-1 Manage Stakeholder Involvement

SP 2.2-1 Manage Dependencies

SP 2.3-1 Resolve Coordination Issues

SG 3 Use the Project's Shared Vision for IPPD

SP 3.1-1 Define Project's Shared Vision for IPPD

SP 3.2-1 Establish the Project's Shared Vision

SG 4 Organize Integrated Teams for IPPD

SP 4.1-1 Determine Integrated Team Structure for the Project

SP 4.2-1 Develop a Preliminary Distribution of Requirements to Integrated Teams

SP 4.3-1 Establish Integrated Teams

 

Integrated Supplier Management (ISM)

A Project Management process area at Maturity Level 3

 

Purpose

 

The purpose of Integrated Supplier Management (ISM) is to proactively identify sources of products that may be used to satisfy the project's requirements and to manage selected suppliers while maintaining a cooperative project-supplier relationship.

 

Specific Practices by Goal

 

SG 1 Analyze and Select Sources of Products

SP 1.1-1 Analyze Potential Sources of Products

SP 1.2-1 Evaluate and Determine Sources of Products

SG 2 Coordinate Work with Suppliers

SP 2.1-1 Monitor Selected Supplier Processes

SP 2.2-1 Evaluate Selected Supplier Work Products

SP 2.3-1 Revise the Supplier Agreement or Relationship

 

Integrated Teaming (IT)

A Project Management process area at Maturity Level 3

 

Purpose

 

The purpose of Integrated Teaming (IT) is to form and sustain an integrated team for the development of work products.

 

Specific Practices by Goal

 

SG 1 Establish Team Composition

SP 1.1-1 Identify Team Tasks

SP 1.2-1 Identify Needed Knowledge and Skills

SP 1.3-1 Assign Appropriate Team Members

SG 2 Govern Team Operation

SP 2.1-1 Establish a Shared Vision

SP 2.2-1 Establish a Team Charter

SP 2.3-1 Define Roles and Responsibilities

SP 2.4-1 Establish Operating Procedures

SP 2.5-1 Collaborate among Interfacing Teams

 

Measurement and Analysis (MA)

A Support process area at Maturity Level 2

 

Purpose

 

The purpose of Measurement and Analysis (MA) is to develop and sustain a measurement capability that is used to support management information needs.

 

Specific Practices by Goal

 

SG 1 Align Measurement and Analysis Activities

SP 1.1-1 Establish Measurement Objectives

SP 1.2-1 Specify Measures SP 1.3-1 Specify Data Collection and Storage Procedures

SP 1.4-1 Specify Analysis Procedures

SG 2 Provide Measurement Results

SP 2.1-1 Collect Measurement Data

SP 2.2-1 Analyze Measurement Data

SP 2.3-1 Store Data and Results

SP 2.4-1 Communicate Results

 

Organizational Environment for Integration (OEI)

A Support process area at Maturity Level 3

 

Purpose

 

The purpose of Organizational Environment for Integration (OEI) is to provide an Integrated Product and Process Development (IPPD) infrastructure and manage people for integration.

 

Specific Practices by Goal

 

SG 1 Provide IPPD Infrastructure

SP 1.1-1 Establish the Organization's Shared Vision

SP 1.2-1 Establish an Integrated Work Environment

SP 1.3-1 Identify IPPD-Unique Skill Requirements

SG 2 Manage People for Integration

SP 2.1-1 Establish Leadership Mechanisms

SP 2.2-1 Establish Incentives for Integration

SP 2.3-1 Establish Mechanisms to Balance Team and Home Organization Responsibilities

 

Organizational Innovation and Deployment (OID)

A Process Management process area at Maturity Level 5

 

Purpose

 

The purpose of Organizational Innovation and Deployment (OID) is to select and deploy incremental and innovative improvements that measurably improve the organization's processes and technologies. The improvements support the organization's quality and process-performance objectives as derived from the organization's business objectives.

 

Specific Practices by Goal

 

SG 1 Select Improvements

SP 1.1-1 Collect and Analyze Improvement Proposals

SP 1.2-1 Identify and Analyze Innovations

SP 1.3-1 Pilot Improvements

SP 1.4-1 Select Improvements for Deployment

SG 2 Deploy Improvements

SP 2.1-1 Plan the Deployment areas

SP 2.2-1 Manage the Deployment

SP 2.3-1 Measure Improvement Effects

 

Organizational Process Definition (OPD)

A Process Management process area at Maturity Level 3

 

Purpose

 

The purpose of Organizational Process Definition (OPD) is to establish and maintain a usable set of organizational process assets.

 

Specific Practices by Goal

 

SG 1 Establish Organizational Process Assets

SP 1.1-1 Establish Standard Processes

SP 1.2-1 Establish Life-Cycle Model Descriptions

SP 1.3-1 Establish Tailoring Criteria and Guidelines

SP 1.4-1 Establish the Organization's Measurement Repository

SP 1.5-1 Establish the Organization's Process Asset Library

 

Organizational Process Focus (OPF)

A Process Management process area at Maturity Level 3

 

Purpose

The purpose of Organizational Process Focus (OPF) is to plan and implement organizational process improvement based on a thorough understanding of the current strengths and weaknesses of the organization's processes and process assets.

 

Specific Practices by Goal

SG 1 Determine Process Improvement Opportunities

SP 1.1-1 Establish Organizational Process Needs

SP 1.2-1 Appraise the Organization's Processes

SP 1.3-1 Identify the Organization's Process Improvements

SG 2 Plan and Implement Process Improvement Activities

SP 2.1-1 Establish Process Action Plans

SP 2.2-1 Implement Process Action Plans

SP 2.3-1 Deploy Organizational Process Assets

SP 2.4-1 Incorporate Process-Related Experiences into the Organizational Process Assets

 

Organizational Process Performance (OPP)

A Process Management process area at Maturity Level 4

 

Purpose

 

The purpose of Organizational Process Performance (OPP) is to establish and maintain a quantitative understanding of the performance of the organization's set of standard processes in support of quality and process-performance objectives, and to provide the process performance data, baselines, and models to quantitatively manage the organization's projects.

 

Specific Practices by Goal

SG 1 Establish Performance Baselines and Models

SP 1.1-1 Select Processes

SP 1.2-1 Establish Process Performance Measures

SP 1.3-1 Establish Quality and Process Performance Objectives

SP 1.4-1 Establish Process Performance Baselines

SP 1.5-1 Establish Process Performance Models

 

Organizational Training (OT)

A Process Management process area at Maturity Level 3

 

Purpose

The purpose of Organizational Training (OT) is to develop the skills and knowledge of people so that they can perform their roles effectively and efficiently.

 

Specific Practices by Goal

 

SG 1 Establish an Organizational Training Capability

SP 1.1-1 Establish the Strategic Training Needs

SP 1.2-1 Determine Which Training Needs Are the Responsibility of the Organization

SP 1.3-1 Establish an Organizational Training Tactical Plan

SP 1.4-1 Establish Training Capability SG 2 Provide Necessary Training

SP 2.1-1 Deliver Training

SP 2.2-1 Establish Training Records

SP 2.3-1 Assess Training Effectiveness

 

Product Integration (PI)

An Engineering process area at Maturity Level 3

 

Purpose

 

The purpose of Product Integration (PI) is to assemble the product from the product components, ensure that the product, as integrated, functions properly and deliver the product.

 

Specific Practices by Goal

 

SG 1 Prepare for Product Integration

SP 1.1-1 Determine Integration Sequence

SP 1.2-1 Establish the Product Integration Environment

SP 1.3-1 Establish Product Integration Procedures and Criteria

SG 2 Ensure Interface Compatibility

SP 2.1-1 Review Interface Descriptions for Completeness

SP 2.2-1 Manage Interfaces

SG 3 Assemble Product Components and Deliver the Product

SP 3.1-1 Confirm Readiness of Product Components for Integration

SP 3.2-1 Assemble Product Components

SP 3.3-1 Evaluate Assembled Product Components

SP 3.4-1 Package and Deliver the Product or Product Component

 

Project Monitoring and Control (PMC)

A Project Management process area at Maturity Level 2

 

Purpose

 

The purpose of Project Monitoring and Control (PMC) is to provide an understanding of the project's progress so that appropriate corrective actions can be taken when the project's performance deviates significantly from the plan.

 

Specific Practices by Goals

 

SG 1 Monitor Project against Plan

SP 1.1-1 Monitor Project Planning Parameters

SP 1.2-1 Monitor Commitments

SP 1.3-1 Monitor Project Risks

SP 1.4-1 Monitor Data Management

SP 1.5-1 Monitor Stakeholder Involvement

SP 1.6-1 Conduct Progress Reviews

SP 1.7-1 Conduct Milestone Reviews

SG 2 Manage Corrective Action to Closure

SP 2.1-1 Analyze Issues SP 2.2-1 Take Corrective Action

SP 2.3-1 Manage Corrective Action

 

Project Planning (PP)

A Project Management process area at Maturity Level 2

 

Purpose

 

The purpose of Project Planning (PP) is to establish and maintain plans that define project activities.

 

Specific Practices by Goal

 

SG 1 Establish Estimates

SP 1.1-1 Estimate the Scope of the Project

SP 1.2-1 Establish Estimates of Work Product and Task Attributes

SP 1.3-1 Define Project Life Cycle

SP 1.4-1 Determine Estimates of Effort and Cost

SG 2 Develop a Project Plan

SP 2.1-1 Establish the Budget and Schedule

SP 2.2-1 Identify Project Risks

SP 2.3-1 Plan for Data Management

SP 2.4-1 Plan for Project Resources

SP 2.5-1 Plan for Needed Knowledge and Skills

SP 2.6-1 Plan Stakeholder Involvement

SP 2.7-1 Establish the Project Plan

SG 3 Obtain Commitment to the Plan

SP 3.1-1 Review Plans that Affect the Project

SP 3.2-1 Reconcile Work and Resource Levels

SP 3.3-1 Obtain Plan Commitment

 

Process and Product Quality Assurance (PPQA)

A Support process area at Maturity Level 2

 

Purpose

 

The purpose of Process and Product Quality Assurance (PPQA) is to provide staff and management with objective insight into processes and associated work products.

 

Specific Practices by Goal

 

SG 1 Objectively Evaluate Processes and Work Products

SP 1.1-1 Objectively Evaluate Processes

SP 1.2-1 Objectively Evaluate Work Products and Services

SG 2 Provide Objective Insight

SP 2.1-1 Communicate and Ensure Resolution of Noncompliance Issues

SP 2.2-1 Establish Records

 

Quantitative Project Management (QPM)

A Project Management process area at Maturity Level 4

 

Purpose

 

The purpose of the Quantitative Project Management (QPM) process area is to quantitatively manage the project's defined process to achieve the project's established quality and process-performance objectives.

 

Specific Practices by Goal

 

SG 1 Quantitatively Manage the Project

SP 1.1-1 Establish the Project's Objectives

SP 1.2-1 Compose the Defined Processes

SP 1.3-1 Select the Sub processes that Will Be Statistically Managed

SP 1.4-1 Manage Project Performance

SG 2 Statistically Manage Sub process Performance

SP 2.1-1 Select Measures and Analytic Techniques

SP 2.2-1 Apply Statistical Methods to Understand Variation

SP 2.3-1 Monitor Performance of the Selected Sub processes

SP 2.4-1 Record Statistical Management Data

 

Requirements Development (RD)

An Engineering process area at Maturity Level 3

 

Purpose

 

The purpose of Requirements Development (RD) is to produce and analyze customer, product, and product-component requirements.

 

Specific Practices by Goal

 

SG 1 Develop Customer Requirements

SP 1.1-1 Collect Stakeholder Needs

SP 1.1-2 Elicit Needs

SP 1.2-1 Develop the Customer Requirements

SG 2 Develop Product Requirements

SP 2.1-1 Establish Product and Product-Component Requirements

SP 2.2-1 Allocate Product-Component Requirements

SP 2.3-1 Identify Interface Requirements

SG 3 Analyze and Validate Requirements

SP 3.1-1 Establish Operational Concepts and Scenarios

SP 3.2-1 Establish a Definition of Required Functionality

SP 3.3-1 Analyze Requirements

SP 3.4-3 Analyze Requirements to Achieve Balance

SP 3.5-1 Validate Requirements

SP 3.5-2 Validate Requirements with Comprehensive Methods

 

Requirements Management (REQM)

An Engineering process area at Maturity Level 2

 

Purpose

 

The purpose of Requirements Management (REQM) is to manage the requirements of the project's products and product components and to identify inconsistencies between those requirements and the project's plans and work products.

 

Specific Practices by Goal

 

SG 1 Manage Requirements

SP 1.1-1 Obtain an Understanding of Requirements

SP 1.2-2 Obtain Commitment to Requirements SP 1.3-1 Manage Requirements Changes SP 1.4-2 Maintain Bidirectional Traceability of Requirements

SP 1.5-1 Identify Inconsistencies between Project Work and Requirements

 

Risk Management (RSKM)

A Project Management process area at Maturity Level 3

 

Purpose

The purpose of Risk Management (RSKM) is to identify potential problems before they occur so that risk-handling activities can be planned and invoked as needed across the life of the product or project to mitigate adverse impacts on achieving objectives.

 

Specific Practices by Goal

 

SG 1 Prepare for Risk Management

SP 1.1-1 Determine Risk Sources and Categories

SP 1.2-1 Define Risk Parameters

SP 1.3-1 Establish a Risk Management Strategy

SG 2 Identify and Analyze Risks

SP 2.1-1 Identify Risks

SP 2.2-1 Evaluate, Categorize, and Prioritize Risks

SG 3 Mitigate Risks

SP 3.1-1 Develop Risk Mitigation Plans

SP 3.2-1 Implement Risk Mitigation Plans

 

Supplier Agreement Management (SAM)

A Project Management process area at Maturity Level 2

 

Purpose

 

The purpose of Supplier Agreement Management (SAM) is to manage the acquisition of products from suppliers for which there exists a formal agreement.

 

Specific Practices by Goal

 

SG 1 Establish Supplier Agreements

SP 1.1-1 Determine Acquisition Type

SP 1.2-1 Select Suppliers

SP 1.3-1 Establish Supplier Agreements

SG 2 Satisfy Supplier Agreements

SP 2.1-1 Review COTS Products

SP 2.2-1 Execute the Supplier Agreement

SP 2.3-1 Accept the Acquired Product

SP 2.4-1 Transition Products

 

Technical Solution (TS)

An Engineering process area at Maturity Level 3

 

Purpose

 

The purpose of Technical Solution (TS) is to design, develop, and implement solutions to requirements. Solutions, designs, and implementations encompass products, product components, and product-related life-cycle processes either alone or in appropriate combination.

 

Specific Practices by Goal

 

SG 1 Select Product-Component Solutions

SP 1.1-1 Develop Alternative Solutions and Selection Criteria

SP 1.1-2 Develop Detailed Alternative Solutions and Selection Criteria

SP 1.2-2 Evolve Operational Concepts and Scenarios

SP 1.3-1 Select Product-Component Solutions

SG 2 Develop the Design

SP 2.1-1 Design the Product or Product Component

SP 2.2-3 Establish a Technical Data Package

SP 2.3-1 Establish Interface Descriptions

SP 2.3-3 Design Interfaces Using Criteria

SP 2.4-3 Perform Make, Buy, or Reuse Analyses

SG 3 Implement the Product Design

SP 3.1-1 Implement the Design

SP 3.2-1 Develop Product Support

 

Documentation Validation (VAL)

An Engineering process area at Maturity Level 3

 

Purpose

 

The purpose of Validation (VAL) is to demonstrate that a product or product component fulfills its intended use when placed in its intended environment.

 

Specific Practices by Goal

SG 1 Prepare for Validation

SP 1.1-1 Select Products for Validation

SP 1.2-2 Establish the Validation Environment

SP 1.3-3 Establish Validation Procedures and Criteria

SG 2 Validate Product or Product Components

SP 2.1-1 Perform Validation

SP 2.2-1 Analyze Validation Results

 

Verification (VER)

An Engineering process area at Maturity Level 3

 

Purpose

 

The purpose of Verification (VER) is to ensure that a selected work product meets their specified requirements.

 

Specific Practices by Goal

 

SG 1 Prepare for Verification

SP 1.1-1 Select Work Products for Verification

SP 1.2-2 Establish the Verification Environment

SP 1.3-3 Establish Verification Procedures and Criteria

SG 2 Perform Peer Reviews

SP 2.1-1 Prepare for Peer Reviews

SP 2.2-1 Conduct Peer Reviews

SP 2.3-2 Analyze Peer Review Data

SG 3 Verify Selected Work Products

SP 3.1-1 Perform Verification

SP 3.2-2 Analyze Verification Results and Identify Corrective Action.

If you want to buy the project management book mail [email protected]  for more details or call any of our book shops MUMBAI-22078296/97/022-22070989, KOLKATA-22826518/19 HYDERABAD-24756967,24756400,BANGALORE-25587923, 25584641,AHMEDABAD-26421611,BHATINA(PUNJAB)-2237387,CHENNAI-28410796,28550491,DELHI/NEWDELHI-23254990/91,23325760,26415092,24691288.If you want to write to the author directly email at [email protected]
 