Camp Hill Urban Village/Midland Quarry

 

Contents

 

  1. Planning application form and certificates
  2. Planning Application Supporting Statement, Entec

Appendix 1 Supplementary Planning Guidance

Appendix 2 INF3 traffic impact assessment

Appendix 3 Camp Hill Environmental Impact study

        C.    Environmental Statement: Non technical summary and main report Wardell Armstrong

Appendix  Scoping Report

  1.  Transport Assessment, Joynes Pike Associates <?JMP if timing a problem?>
  2. Outline reclamation feasibility study, WS Atkins <? Blackwells scheme>
  3. Preliminary Drainage/Hydrological and Ecological recommendations

Arup/Entec/Wardell Armstrong

 

 

Letter to NBBC

 

On behalf of Mininvest plc <or could be Century Park Ltd or Midland Marina Ltd to begin site promotion> we are submitting planning applications for the proposed redevelopment of Midland Quarry for mixed use and industrial use (Dev 5 INF3 and Dev 11).

 

This application pack includes information about the developments, the environmental effects and a transport assessment.  We will be pleased to answer questions from yourselves or consultees – please direct these to *, our project manager.

 

Planning Application forms

Part 1

 

Applicant                              Mininvest plc                      

Agent                                     Entec UK Ltd (fao *)

                                                Land at Midland Quarry

                                                Camp Hill Urban Village/Midland Quarry

Mixed use urban village development incorporating housing, employment, leisure and local retail facilities

New buildings YES

Alteration NO

Change of use YES

New access YES

Alteration highway YES

Outline for erection of buildings YES

No ticks

Full planning NO

Approval reserved matter NO

Renewal temp permission NO

Perm retention NO

Present use REDUNDANT MINERAL WORKINGS AND WASTE HEAPS

Vacant MAJORITY OF SITE IS VACANT (SEE PLANNING SUPPORTING STATEMENT)

Ground instability SITE INVESTIGATION AND SLOPE STABILITY WORKS HAVE BEEN UNDERTAKEN AS HAVE PRELIMINARY CONSULTATIONS WITH EA AND NBBC (SEE PLANNING SUPPORTING STATEMENT)

Felling trees YES SITING IS A RESERVED MATTER.  FOR DETAILS OF POSSIBLE LOSSES SEE THE ACCOMPANYING ENVIRONMENTAL STATEMENT

External EXTERNAL APPEARANCE IS A RESERVED MATTER

Surface water DEVELOPMENT WILL BE CONNECTED TO THE MAIN SURFACE WATER AND FOUL SEWAGE NETWORK.

Lists of drawings LISTS OF PLANS AND DOCUMENTS SUBMITTED WITH THE APPLICATION CAN BE FOUND IN THE ACCOMPANYING PLANNING SUPPORTING

STATEMENT

 

We apply for planning to carry out the development described in this application and the accompanying plans and in accordance therewith

 

Part 2 non resdential

 

  1. Industrial.  This is a matter for detailed design
  2. Larger scheme.  Reference is made to Camp Hill Urban Village
  3. Existing use. N/A
  4. (a) total floorspace                               120,000 sq ft                         

(b) industrial                                         80,000 sq ft

(c ) office

(d) retail

(e) storage

(f) warehousing                    40,000 sq ft

(g) other

5.  Staff.  Total direct employment generated estimated to be 180

6.  Parking. This is a matter for detailed design.  Details of assumptions made can be found in the accompanying Planning Supporting Statement

7.  Traffic flow.  Details provided in accompanying Transport Assessment.

8.  Effluents.  This is a matter for detailed design.

9.  Hazardous.  No

 

Part 3 residential

 

List types.  Details in accompanying planning supporting statement.  No. 160.

Persons.     Details in accompanying Planning Supporting Statement.  No. 350

Garages.     To be determined by detailed design.

Off street.   To be determined by detailed design.

Drying.        To be determined by detailed design.

Refuse.         To be determined by detailed design

 

Agricultural Holdings Certificate

 

None of the land to which the application relates is or is part of an agricultural holding.

 

Ownerships.  All land is in the ownership of Mininvest plc. <except INF3 option land which option should be exercised by application date>

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Camp Hill Urban Village/Midland Quarry

 

Planning application supporting statement

 

1,  Introduction

1.1  Camp Hill Urban Village: the story so far

 

Camp Hill is part of an extensive area of Western Nuneaton which has been identified as a focus of private and public sector regeneration funding. 

 

The principal components are

Demolition and building of new homes

Employment and mixed use at Midland Quarry

New infrastructure

New village centre and facilities

 

Following a period of public consultation supplementary planning guidance covering development proposals at Midland Quarry was approved by Nuneaton and Bedworth Borough Council in 2000 in accordance with the Strategic development Framework for Camp Hill Urban Village published in February 2000. 

 

Following confirmation of the availability in principle of public funding to enable the clearance of spoil overburden and build access infrastructure a subcommittee chaired by the Regional Development Agency Advantage West Midlands and including the Princes Foundation, Warwickshire County Council and Nuneaton and Bedworth Borough Council has met to facilitate and procure development and regeneration in line with the Strategic Framework and Supplementary Planning Guidance for Midland Quarry.  In February 2002 Warwickshire County Council were given first stage approval to receive an ERDF Objective 2 grant of £1m from Government Office for Midland Quarry.

 

Century Park submits this application as the next key stage in the development of the Urban Village proposals which through the grant of outline planning permission will bring the concept of the Urban Village closer to becoming a reality with the resultant environmental, social and economic benefits for the existing and future residents, workers and visitors to the area.

 

1.2  Purpose of application

This planning application is an outline application for Midland Quarry, and all matters are reserved for subsequent approval by Nuneaton and Bedworth Borough Council.

 

This application is submitted by Century Park Ltd in order to establish whether the development proposals contained herein for Midland Quarry are acceptable in principle by Nuneaton and Bedworth Borough Council.

 

A number of matters require further investigation and details of the exact siting, design, external appearance, means of access and landscaping for Midland Quarrywill be agreed with the Council and other statutory bodies once the principle of development is confirmed through granting of outline planning permission.

 

1.3  List of information supporting this application

1.4  Structure of supporting statement

 

2.  Site Description

2.1  site location

2.1.1  Site context

2.1.2  Site boundary and existing use

2.2  Land ownership

2.3  Site history

 

3. Description of development

3.1  Outline of proposals

3.2  Mix of uses

3.3  density of development

3.4  Access arrangements and car parking

3.5  Open space and landscaping

3.6  Water feature

3.7  Ground conditions

3.8  Phasing of development

 

4. Development Principles

4.1  Camp Hill Urban Village : a sustainable approach

4.2  making efficient use of land and resources

4.3  Providing a good mix of uses

4.4  Increasing accessibility

4.5  Enhancing the local environment

4.6  Integrating proposals with existing urban fabric

4.7  Providing a safe living and working environment

4.8  Energy efficiency

 

5. Meeting Policy Objectives

5.1  National and regional Context

5.2 NBBC and WCC Policies and Objectives

 

6. Environmental Implications

6.1  Key conclusion of Environmental Impact Assessment

6.2  Key conclusions of Transport Assessment

 

  1. Determining the Application

 

7.1       Summary of key benefits of the scheme

7.2        Conclusions

 

Tables

 

 

Figures

 

Appendices

 

 

Appendix 1

Supplementary Planning Guidance for Camp Hill Urban Village

 

Appendix 2

Traffic Impact Assessment for INF3

 

Appendix 3

Camp Hill Urban Village Environmental Study

 

 

Appendix 1

Supplementary Planning Guidance for Camp Hill Urban Village

 

Extracts relevant to Midland Quarry

 

  1. The aim of this supplementary planning guidance

 

1.1       This SPG aims at guiding development and redevelopment at Camp hill Nuneaton in accordance with the Strategic development Framework for Camp Hill Urban Village published in February 2000.  the framework envisages a major urban renewal project based on the Urban Village concept and carried out by public bodies, developers, the voluntary sector and the local community working in partnership.  This guidance develops that framework and brings it within the statutory planning process.  It sets the criteria that will guide development in support of the long term aimof the Urban Village Project, which is to reverse the current cycle of physical economic and social decline by creating a sustainable community in a pleasant environment.

 

1.2       This accords with key aims in the Councils corporate plan

 

- to provide the best possible services at all times within available resources

- to protect sustain and seek to enhance the quality of the local environment

- to improve the quality of life for all those who live in the borough

- to encourage local people to take an active part in their communities

 

This SPG also supplements current Borough Local Plan Policies whilst recognizing that the local plan is under review.  It reflects National Planning Policy Guidance Notes (PPG) particularly PPG3 and PPG13 and emerging policy contained in the County Councils Local Transport Plan and its draft guidance, Transport and Roads for New Development.

 

1.3       This guidance covers the Camp hill area as defined on plan 1.  It is bounded by Tuttle Hill to the North East, by the Birmingham and Leicester Rialway line to the south, by Whittleford Road and Bucks Hill to the west and by Green Lane and Camp Hill Road to the north.

 

There are some 6000 residents with a wide range of public and private housing tenure some extensive swathes of open space local schools a small local shopping centre and two industrial areas and a former quarry site.

 

1.4       This guidance defines the principles which the Council will apply to all new development and redevelopment proposals in the Camp hill area and will be a material consideration in the determination of planning applications, etc.  Normally planning applications will be required to demonstrate compliance with this guidance.  Applicants will need to be creative and pragmatic in their interpretation of the principles set out in this Guidance, and in turn the Borough Council will respond positively in exceptional circumstances to those applicants who demonstrate a justifiable departure from those principles.  The guidance will be used to assist:

 

- the acquisition and disposal of land for development

- the control of development through the planning system

- the design and construction of new and improved roads

- the implementation of traffic management schemes

- the development and enhancement of open spaces and public areas

 

  1. Planning Background

 

  1. Management of the Urban Village Scheme

 

  1. key attributes of the Framework

 

  1. Urban Design and Land Use principles

 

5.1       Creating a sense of place

5.2       Density

5.3       Mixture of uses

5.4       Diversity of housing tenure

5.5       Connectivity

5.6       Sustainablity

5.7       Life Cycle

5.8       Security/stewardship

5.9       Quality of the public realm

5.10    Identifiable neighbourhoods

5.11    Community Focus

 

6,  General Design ground rules

 

6.1     The report of the Urban Task Force “towards and urban renaissance” provides a set of basic ground rules for urban design in general.

6.2     Site and setting

6.3     Context, scale and character

6.4     Public realm

6.5     Access and permeability

6.6     Optimising land use and density

6.7     Mixing activities

6.8     Mixing tenures

6.9     Building to last

6.10  Sustainable building

6.11  Environmental responsibility

 

  1. Basic design component codes

 

Urban form and mixed use

Density and Intensity

Landmarks

Urban Form

Mixed Use

Public Space

Building Form and architecture

Streets, movement and infrastructure

 

  1. Details of individual proposals and detailed guidance

 

8.1     Ths guidance divides the Urban Village into four distinct geographical areas as shown on plan 1

 

Area 4 is located in the east of the Urban Village and is centre around Pool Road Industrial Estate and the Midland Quarry

 

The individual development project abbreviations are those used in the Strategic development Framework and their location are shown on Plan 2. (Taken from the Framework document – Figure 6.1).

 

12       Area 4

 

12.1    This area is located to the east of the study area andd comprises a package of proposals that essentially focus on employment and recreation related development with interspersions of housing.

12.2    The key projects are

 

Inf3 – New Road link connecting Tuttle Hill Road to Willow Road

Dev 2 – Housing/mixed use adjacent to the Hedgerows

Dev 10 – Willow Road employment

Dev 5 – Midland Quarry employment

Dev 11 Midland Quarry employment/mixed use

Env 2 – Midland Quarry Environmental improvement

Imp 1 – Pool Road Industrial estate improvement area

 

12.3    The key improvement to this area is the proposed new link road connecting Willow Road to Tuttle Hill Road.  This should ease the current situation where industrial traffic from Pool Road Industrial Estate and residential traffic combine along Queen Elizabeth Road (above its junction with Hillary Road).  The new road link constructed to industrial estate road standard will need to be traffic calmed.  The link road is key to the implementation of other projects within this area.

 

12.4    Dev 2 is a privately owned site with existing planning consent for housing.  In line with this guidance a higher density mixed use scheme might now be more appropriate.

 

12.5    A later phase (approximately years 3-5 of the village project) of employment related development is envisaged on site Dev 10, north west of the current industrial estate.  Located between Hillary Road and Willow Road the site should take advantage of the new road link to Tuttle Hill.

 

12.6    Dev 11 is another longer term project fronting Tuttle Hill and requires the partial infilling of Midland Quarry providing mixed use and employment related development.

 

12.7    To ensure integration of these new developments into the existing fabric there is a need to improve the existing industrial estate as defined by Site IMP1.  The estate is currently finctional rather than attractive and density is lowwith much of the land being used for open storage.  An improvement programme to consist of environmental improvements, grant support for building projects and targeted business support is envisaged and could lift the efficiency and appearance of the estate to enable inward investment.

 

12.8    The infilling of part of the quarry – to extend land to the north of the quarry for development (site Dev 11) could use materials from the demolition from housing in Area 3 or the earth removed as a result of constructing the balancing lake.  The remaining quarried area could be aised in level and used for water balancing and ideally as a recreational resource for leisure and wildlife.  Alternative uses for the redundant quarry should also be explored and will be considered positively where they meet the principles outlined in this guidance.  Employment opportunities in particular would be beneficial land uses in this area.

 

Site dev 2

 

12.9    This site adjoins open space to the south and is south east of the recent residential ‘Hedgerows’ development.  The site is currently vacant and overgrown with vegetation sloping southwest towards the open space.  A mixed use scheme of offices/light industrial and residential units is sought.  Access shold be via the development of a new road from Tuttle Hill to Willow Road.  Development of this site must be harmonious with development at the Hedgerows whilst creating a frontage to the Hollystitches open space in addition to Tuttle Hill itself.

 

A relatively early development of this site is envisaged subject to matters regarding drainage and highways.

 

Issues to be resolved prior to an application being submitted

 

12.10 The access to this site should be via the proposed link road to connect Tuttle Hill to Willow Road.  The road should be in place and available for use in so far as it serves the site prior to any development of Dev 2.

12.11 The drainage of the site will require a comprehensive drainage strategy.  Capacity does not exist within the existing network to drain this site.

12.12 An open space strategy is required to include proposals for the open space south west of site dev 2.  The upgrading of this space to include boundary treatments along the northern boundary of that space are required.  Measures to prevent vehicular access including that of motorcycles will be sought notably along the open space boundary with the proposed link road (INF3)

 

Details to be submitted with any planning application

 

12.13 A transport Assessment to assess movement and junction improvements required should be submitted.  Mixed use development as envisaged can generate traffic throughout the day/evening.  The existing crawler lane could serve a purpose to facilitate traffic turning left into the proposed new road and indeed this development.  A ‘ghost’ lane for traffic coming downhill and turning right is likely to be required.

12.14 The levels of this site and how it relates to existing residential development northwest are important issues to address.  A development is required which is harmonious with the adjacent residences whilst creating a gateway feature that has a strong attractive façade to both Tuttle Hill, the proposed link road and the open space area.  This will encourage a sense of ownership to that space particularly where the use of perimeter blocks on site Dev 2’s boundary with this space can create and attractive frontage.

 

Plans detailing levels and the sites relationship with adjacent uses will be required.

 

12.15  design statement to illustrate how the development meets the principles within this guidance particularly those relating to gateway features and achieving mixed use development will be required.

12.16 A carefully designed communal parking scheme to serve the mixed usesshould provide safe accessible parking.  Design should be used within the site and at its perimeter to discourage on street parking outside of the parking areas.

12.17 A mixed use scheme of private/low cost home ownership dwellings and office or light industrial (B1) units is essential.

 

Achieving employment development particularly within this area of the urban village supporting and lifting the profile of the industrial estate beyond is a key function of this gateway site.

 

Drainage and the treatment of Holleystiches Brook

 

12.18 The development of this site and the INF3 link road will have an impact on the sensitive ecological habitats of the Holleystitches Brook.  An environmental assessment of this development (site dev 2 and the INF3 road) should detail the implications of the development and include mitigation measures to reduce adverse impacts on the brook and marsh habitats adjacent to it.

 

Potential obligations

 

12.19 A contribution towards local environmental improvements on the adjacent open space is required.  This contribution will be identified as a result of the open space strategy and will include open space maintenance contributions unless these are secured through other funding arrangements.

12.20 Contributions towards public transport are likely to be sought as a result of the traffic Assessment required.  This could include the provision of bus stops/shelters on Tuttle Hill.  Suitable crossing facilities on Tuttle Hill and on the new link road will also be sought.

12.21 Junction improvements will be required to address the connecting of Tuttle Hill to the new link road (INF3).  This could also have implications for the crawler lane on Tuttle Hill.  Traffic lights, new signage and other associated works in agreement with the Highway Authority will be sought.

 

Sires dev 5 and Dev 10

 

12.22 These are two key employment sites that could raise the economic stability of the urban village.  Both however require the consideration of issues and submission of details that demonstrate the developments compatibility most importantly with the natural environment.  Site Dev 5 in particular is a marshy habitat with much herb growth and dense tree/shrub coverage.

It is significantly lower in level to the housing north of this site and construction of satisfactory access could be difficult.

 

12.23 Site Dev 10 however is open space sloping away from housing on Willow Road.  The amenity of these properties will be an important consideration of any development.

 

Trees to the west and north west of Maple Road are a valuable resource and should be respected if site Dev 10 is developed.

 

Issues to be addressed prior to applications being received

 

12.24 The drainage of both sites is complex and will require a comprehensive strategy.  British waterways have already stated that no further surface water can be discharged into the canal and thus surface water balancing is required.  Dev 10 is a site constrained by sewers along its length underground and floods regularly.  Details should address these issues with a satifactory drainage system and reflect these constraints on the design and layout of the site.  Channelling of potential floodwater could be a measure built into the sites infrastructure.

12.25 Dev 5 is identified on the borough Green Plan as a key wildlife site providing a link to an established wildlife corridor and providing a valuable buffer between the existing industrial estate and the disused quarry – which is a geological area of regional importance.  The implications of development on the wildlife site and mitigation measures if appropriate must be carried out prior to any planning application being determined.

 

These developments are also reliant on the construction of the link road (INF3) to base course level and associated highway works to discourage the use of Queen Elizabeth Road by industrial traffic, prior to their commencement.

 

Details to be submitted with an application

 

12.26 A transport assessment to assess the impacts of these developments is required.  Measures should be considered as part of this assessment to discourage traffic moving out of these employment sites and through to Queen Elizabeth Road.

 

The new link road will be required to be constructed and available for use for these development sites prior to their development being completed.

 

12.27 The relationship between these development sites and adjacent dwellings – Willow Road and Hawthorne Terrace should be addressed.  The difference in levels should be considered in any development proposals.

12.28 Only uses falling within Class B1 of the Town & Country Planning (use classes) Order 1987 will be permitted.

12.29 Footpaths run through both sites and these should be retained or procedures undertaken to divert them.  The footpath through Dev 5 in particular should be landscaped in accordance with a landscaping scheme as it is important to continue this green link and encourage its use.  The construction of a footbridge across the canal should form part of any proposals for this sites development.  This footpath should be in place and its access retained through construction works and after completion the footbridge should be secured.

12.30 The trees west and north west of Maple Road behind the residential properties should be retained.  Wher ehte boundary of the site Dev 10 adjoins this area of trees appropriate boundary treatments will be required.

 

Sites dev 11 and Env2

 

12.31 This employment and mixed use site is another key employment site where the employment prospects of the Urban Village could be concentrated and intensified should development of sites dev 10 and Dev 5 prove difficult.

 

Being a gateway site the scheme should present a strong statement of vitality for those entering the Urban Village study area.  The site area will be increased by the infilling partially of Midland Quarry.

 

Issues to be resolved prior to a planning application being received

 

12.32 The infilling partially of Midland Quarry should be linked to and use materials from the demolition of properties in sites dev 6, 8 and 9.  The development of this site will therefore be a longer term project.

12.33 Stability of the land will need to be determined to ensure safe development of the site.

12.34 A comprehensive drainage strategy is required and it is likely that surface water balancing will be a key feature of any scheme.  The use of Midland Quarry for surface water runoff could be explored.  Any additional development that will increase flows into the Barpool Brook must be upstream of the lake outlet.  There is little capacity in the foul sewer network.  This strategy must be approved and be in place prior to applications being determined.

12.35 A transport assessment that considers transport flows and junctions including potential improvements is required.  It is likely that any scheme will need to consider the impact on the existing crawler lane on Tuttle Hill and the heavy goods vehicles that use the Judkins Quarry site opposite will need to be considered in the design of junctionsand how they relate to the Judkins site.

12.36 A recreation/open space strategy to include proposals for the use of the quarry for a recreation resource should accompany plans for site dev 11.  its use as a water recreation/nature conservation site is envisaged unless other proposals come forward suggesting suitable alternative uses.

 

Details that should accompany any planning applications

 

12.37 The sites development includes the partial infilling of Midland Quarry using materials from the demolition associated with sites Dev 6,8.9 and the digging out of the balancing lake – Barpool (Env 1).  The transportation of this material and its use will be subject to careful environmental analysis.

12.38 Plans detailing levels acress the site once infilling is completed should accompany proposals fro development

12.39 Strong frontages of innovative design and quality materials should feature along Tuttle Hill and the canal.  Indeed views of the canal should be explored by developments along the southeast boundary of site dev 11 and where possible views of the Quarry (which will be an important recreation resource).

12.40 A geological survey to identify areas of the Quarry which should be conserved/preserved is required.  The survey will form an important source of data when implementing the associated open space/recreation strategy for the Quarry.

12.41 A network of footpaths and cycleways should accompany detailed plans and link into the open space/recreation strategy and plans for landscaping.  These footpaths and cycleways should link into existing and proposed routes.  Links to the canal connecting from Tuttle Hill a circular walk around the quarry and connections to Hollystitches Valley and footpaths associated with sites Dev 10 and Dev 6 are of priority.

12.42 The development of sites Dev 5, dev 10 and 11 must be supported by a design statement that demonstrates how the proposal supports principlals detailed in this guidance.

12.43 Only offices or B1 light industrial units will be permitted within close proximity to any dwellings.  If other non B1 uses are proposed these must be located a minimum of 100m from the nearest existing or potential (in so far as it relates to site dev 2 or dev 11) residential property.

12.44 Where a mix of use exists in proximity to each for example within the same/adjacent perimeter block of development then a communal parking scheme should be encouraged.  If areas of more concentrated employment use are developed on the site then a more practical approach to accommodating parking for those uses alone is required.  Overall a reduced parking requirement – but one which satisfies the needs of associated land uses is sought.

 

Potential Obligations

 

12.45 contributions towards education provision based on an assessment of need with the area in relation to residential properties proposed may be sought from development.

 

The accessibility of Tuttle Hill as a key bus route should be exploited and contributions towards improving the use of services could be sought.  Bus shelters stops and crossing points to serve them could for part of any funding arrangements.

 

The funding of signage pathways cycleways planting and associated works identified through an approved open space/recreation strategy shall be sought and be in place prior to any units/dwellings being occupied.

 

Contributions will be sought in the light of an associated transport assessment to facilitiate necessary junction/highway improvements to serve this development, unless other funding arrangements are in place.

 

13      Procedural matters

 

13.1  Developer contributiuons

 

13.2  Compulsory Purchase orders and land assembly

 

Environmental Impact assessments (EIA)

 

13.3  Projects of this scale and this complexity will often require an assessment of their potential environmental impact.  Whilst a mixed use housing/employment development might not for example require an EIA the Urban Village is a long term interlinked project where each proposal fits to form one part of a large jigsaw.  It is the overall impact of this development; comprising new roads, some 640 dwellings, mixed uses of employment and retail and substantial environmental works that when viewed as a package requires a formal Environmental Impact assessment.  An assessment is thus required in accordance with the EIA Regulations 1999 (SI 293)

 

The EIA will highlight areas of potential impact associated with a particular sites development.  Such indications may point to a more detailed site/area specific EIA being required.  Development of a new link road, residential and mixed uses off Tuttle Hill within area 4 for example will undoubtedly have an impact on the fragile habitats of Holleystitches valley and the area around Midland Quarry – an area of recognized Geological importance.

 

13.4     EIAs when submitted should accord with the requirements of the aforementioned regulationsand thus include the following details:

 

  1. description of development including in particular
  2. physical characteristics of the whole development and the land use requirements during the constructional and operational phases;
  3. The main characteristics of the production phases, nature and quantity of materials used;
  4. Estimate by type and quantity of expected residues and emissions resulting from operations associated with the proposed development.

 

  1. An outline of the main alternatives and an indication of the main reasons for the choice of development taking into account the environmental effects.

 

  1. A description of the way in which the environment is likely to be significantly effected in particular population, fauna, flora, soil water air climatic factors, material assts, including the architectural and archeological heritage, landscape and the interrelationship between the above factors.

 

  1. A description of the likely significant effects of development on the environment which should cover the direct and indirect effects, secondary, cumulative short medium long term permanent and temporary positive and negative effects of the development resulting from a: the existence of the development, the use of natural resources and the emission of pollutants, creation of nuisances and elimination of waste and the description by the applicant of the forecasting methods used to assess the effects on the environment.

 

  1. A description of the measures envisaged to prevent, reduce or where possible offset any significant adverse effects on the environment.

 

  1. A non technical summary of the information provided as discussed above.

 

  1. 7.  An indication of any difficulties encountered by the applicant in compiling the information required.

 

13.5  Subsequent details or updating of the EIA are likely to be required in support of particular projects often where a greater attention to details is required.  The development within Area 4 for example would require additional details because of the potential impacts the construction of the proposed iNF3 road might have on the fragile ecosystems of Hollystitches Brook.

 

Appendix 2

Traffic Impact Assessment for INF3

 

Appendix 3

Camp Hill Urban Village Environmental Study

 

 

 

 

 

 

 

Camp Hill Urban Village/Midland Quarry

 

Environmental Statement: Non Technical Summary

 

  1. Midland Quarry: Environmental Statement

            Non technical summary

1.1                  Introduction

1.1.1                Background

1.1.2                The Environmental Impact Process

1.1.3                The Method of Assessment

1.2                  Description of the Proposed Development

1.2.1                The Location of the Proposed Development

1.2.2                A Brief History of the Site

1.2.3                Components of the proposed development

1.2.4                Cleaning up the site

1.2.5                Programme of works

1.3                  Environmental Issues

1.3.1                Planning Policy

1.3.2                Socio-economic issues

1.3.3                Air Quality

1.3.4                Noise

1.3.5                Traffic and Transport

1.3.6                Landscape and visual

1.3.7                Cultural Heritage

1.3.8                Water

1.3.9                Land Use and the Quarry Void

1.3.10              Ecology

1.3.11              Public Rights of Way and Recreation

1.4                  Summary of Predicted Effects

1.4.1                Significant Adverse Effects

1.4.2                Significant Positive Effects

1.4.3                Socio-economic factors

1.4.4                Landscape and Visual Effects

1.4.5                The Quarry Void and the Local Environment

1.4.6                Flora and Fauna

1.4.7                Cumulative and Combined Effects

1.5                  Conclusion

 

Table              Principal components of the proposed development

                        Key work programme stages

                        Site Location Plans

                        Site Boundary and Area

                        Composite land use plan

 

Environmental Impact Assessment

Scoping Report

 

MINERAL INVESTMENTS

 

Redevelopment of Midland Quarry

Tuttle Hill Road, Nuneaton

 

Camp Hill Urban Village

 

 

Environmental Scoping Report

 

January 2002


 

 

 

 

 

 

 

DATE ISSUED:

January 2002

JOB NUMBER:

WM02457

REPORT NUMBER:

002

 

 

CLIENT’S REFERENCE:

 

 

MINERAL INVESTMENTS

 

Redevelopment of Midland Quarry

Tuttle Hill Road, Nuneaton

 

Camp Hill Urban Village

 

Environmental Scoping Report

 

 

 

 

 

 

PREPARED BY:

F MacKenzie, Environmental Scientist; ................................................................................................................

 

APPROVED BY:

T Bason, Partner:  .....................................................................................................................................................

 

 

 

 

 

This report has been prepared by Wardell Armstrong with all reasonable skill, care and diligence, within the terms of the Contract with the Client. 

No part of this document may be reproduced without the prior written approval of Wardell Armstrong.

 


 

Contents

1              Introduction

2                    Site Description

3                    Project Description

4              Planning Policy Context

5              Environmental Impact Assessment Methodology

6              Anticipated Scope of Work

6.1           Flora and Fauna

6.2           Ground Conditions

6.3           Water Resources

6.4           Noise and Vibration

6.5           Air Quality

6.6           Cultural Heritage

6.7              Landscape And Visual Impact

6.8              Traffic

6.9              Geology

 

DRAWINGS

WM02457/01 Site location

WM02457/02 Strategic Development Framework

 

APPENDICES

1              Baseline noise survey


1                    INTRODUCTION

The purpose of this document is to outline the scope and range of environmental issues to be considered in the design and construction of the proposed    redevelopment of Midland Quarry, Tuttle Hill Road, Nuneaton (see Drawing WM02457/01 for site location).

 

The Strategic Development Framework for Camp Hill Urban Village (Feb 2000) and the subsequent Supplementary Planning Guidance (July 2000) propose a mixed use redevelopment of the Midland Quarry Site and associated land as part of the regeneration framework for the Camp Hill Urban Village. The Midland Quarry study area contains the following developments (see Drawing WM0245702 for layout of the development areas):

·                     INF 3

·                     DEV 5

·                     DEV 11

·                     ENV 2

(See Section 3 for further details on the development proposals).

 

This document has been prepared to enable statutory and non-statutory consultees to identify any constraints within the development areas, prior to undertaking a baseline survey.

 

A screening opinion was requested from Nuneaton & Bedworth Borough Council (NBBC) relating to the development proposals at Midland Quarry.  NBBC issued a Screening Opinion, in accordance with the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 1999, on 17 October 2001. The Opinion stated that an Environmental Impact Assessment would be required as:

 

‘the development falls within Category 10(a) of Schedule 2 of the above Regulations. Since the site area exceeds the threshold of 0.5ha, the proposal is Schedule 2 development’     

 

2                    SITE DESCRIPTION

The study area is located approximately 1.5 km to the north west of Nuneaton Town Centre, off Tuttle Hill Road (B4114).  The site is located within Ordnance Survey Grid Squares SP 3492 and 3592 (Landranger Map 140) and occupies approximately 14 ha. The south eastern boundary of the site is formed by the Coventry Canal and the B4114 Tuttle Hill Road lies adjacent to the north eastern border. The existing Pool Road Industrial Estate forms the south western boundary and development area INF3 borders the north western boundary beyond which lies Holly Stitches (a designated Site of Nature Conservation Interest), existing and proposed residential development.

 

The areas under consideration for redevelopment are within the confines of the dormant quarry and include a shallow void (DEV 11) and an overburden mound (DEV 5). The mound contains the materials excavated from the surface of the quarry at the commencement of the mining operations.  This mound is now vegetated with scrub. The centre of the study area contains a large void (ENV 2), which is currently partially filled with water. 

 

The main site entrance is located of Tuttle Hill via ‘Intercity Shot Blasting’, however there is a second access, also off Tuttle Hill adjacent to the Crazy Horse Public House and existing industrial units.

 

The existing quarry entrance on to Tuttle Hill Road has sufficient visibility splays to provide for the safe passage of the limited number of vehicles entering and exiting the site. 

 

3                    PROJECT DESCRIPTION

In February 2000 a Strategic Development Framework for Camp Hill Urban Village was published, this was followed by the Camp Hill Urban Village Supplementary Planning Guidance in July 2000.  These documents outline the framework and context within which the proposed redevelopment of Midland Quarry will be taken forward.  The development projects principally referred to within the Midland Quarry study area are as follows:

·                     INF3 -  ‘a new road’ adjacent to the north western site boundary (See Drawing WM02457/02).

·                     DEV 5 - ‘the extension to Pool Road Industriall estate to be known as Century Park’.  The area where the overburden is to be removed from (DEV 5) will be the subject of a detailed application for industrial and commercial uses in accordance with the Borough Local Plan and the recent Supplementary Planning Guidance for this part of Nuneaton. It is envisaged that the development of area DEV 5 will take place over a period of approximately 7 years.  It is anticipated that 11,148m2 (120,000ft2) of office and light industrial units will be created which will be developed in phases of approximately 1,115m2 (12,000ft2).  Access will be via the Queen Elizabeth Road until the anticipated relief road INF 3, or alternative alignment, has been constructed.

·                     DEV 11 - ‘the shallow quarry void to be reclaimmed by limited backfilling, with overburden (removed from the DEV 5 area, approximately 170,000m3 and imported inert wastes up to 300,000m3 to create 1.21ha of developable land.  DEV 11 also includes the redevelopment of existing property fronting Tuttle Hill Road (area IND on Drawing WM02457/02).  The development proposals, identified in the supplementary planning guidance include a mixed use scheme formed by employment and leisure uses.   DEV 11 would be either accessed through the new relief road INF 3, or through a separate junction formed on to Tuttle Hill Road which will be required initially to facilitate the importation of waste.

·                     ENV 2 ‘ the main quarry void’ restoration proposals will be the subject of relevant consultations and a separate application.

 

4              PLANNING POLICY CONTEXT

John Craddock Associates, on behalf of Mineral Investments, requested a screening opinion from Nuneaton & Bedworth Borough Council (NBBC) relating to the development proposals at Midland Quarry.  NBBC issued a Screening Opinion, in accordance with the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 1999, on 17 October 2001. The Opinion stated that an Environmental Impact Assessment would be required as:

 

‘the development falls within Category 10(a) of Schedule 2 of the above Regulations. Since the site area exceeds the threshold of 0.5ha, the proposal is Schedule 2 development’     

 

The accompanying Statement of Reasons summarised the potential impacts of the development proposal as follows:

 

‘EIA is required for Schedule 2 projects where there are likely to be significant environmental effects.

In this case, the development proposals are likely to have a significant effect on established features of nature conservation importance and an environmental statement is therefore required.’

                                                                                                                                                                               

The Scoping Report considers a number of potential developments, which would be submitted as planning applications over a period of time, as itemised below:

1.                  Discharge of mineral permission with respect to the restoration of Midland Quarry to prepare two areas of developable land DEV 5 & DEV 11.  In order to discharge this condition a scheme was submitted to Warwickshire County Council for approval in August 2001.  Determination of the scheme has been delayed until an Environmental Statement has been submitted which considers the redevelopment proposals for Midland Quarry.

2.                  Application for inert waste disposal to prepare DEV 11 for development and complete the restoration of ENV 2.  There will be a detailed application submitted to Warwickshire County Council, which will be linked to the discharge of the restoration of the quarry identified above. An interim access will be formed to allow reclamation of the shallow quarry void (DEV 11) and which may also permit limited development on reclaimed land on DEV 11 in 5 years time when backfilling is complete. See item 4 below.

3.                  Detailed application for DEV 5, with a view to commencing redevelopment in 2002, when the overburden has been removed to infill the shallow part of the quarry void (DEV 11).  This will be linked to the construction of INF 3, providing a new access onto Tuttle Hill Road and Queen Elizabeth Road.

4.                  Outline application for DEV 11.  This application is likely to identify the comprehensive redevelopment proposals for mixed use, including land not in Mineral Investments ownership.  Redevelopment would commence when backfilling of the shallow part of the quarry with imported inert material as been completed.  The total developable area will be reduced from the original scheme, because of the road and the detailed application identified below

5.                  Detailed application for development of commercial units fronting onto Tuttle Hill Road.

 

The study area identified in this Environmental Scoping Report includes all the proposed development identified above.  It would be useful to obtain views on the integrated redevelopment proposals for the site, with particular emphasis on the discharge of the mineral permission and importation of inert wastes, to achieve the development footprint for DEV 5 and DEV 11.

 

5              OUTLINE OF THE ENVIRONMENTAL IMPACT ASSESSMENT

The study assesses the impact of the proposals, in terms of the impact of site development upon environmental conditions.  It will incorporate the following:

·                     A full assessment of baseline parameters.  Such assessment will include ground conditions, landscape, flora and fauna, water resources, noise and air quality;

·                     An assessment of potential impacts, including issues drawn to the attention of the applicant in discussion with Nuneaton Borough Council; and

·                     Review of mitigation matters and residual impacts.

 

Consideration will also be given to the relevant issues raised in the strategic appraisal produced by Warwickshire County Council in April 2001, ‘Camp Hill Urban Village Environmental Appraisal Report’.

 

The purpose of this document is to approach all statutory consultees to determine the scope of the Environmental Impact Assessment, in order to prioritise the detailed assessment analysis.  The list of consultees (statutory and non statutory) is as follows:

 

 

 


Table 1: List of Consultees

Consultee

Issues

Nuneaton and Bedworth Borough Council

Planning/Landscape/Conservation/Noise and Air emissions

English Heritage

Scheduled Monuments

English Nature

Nature Conservation and Protection

Environment Agency

Water Resources/Conservation

Warwickshire Wildlife Trust

Nature Conservation and Protection

Warwickshire County Council

Planning/Landscape/Highways

Countryside Agency

Landscape/built environment

British Waterways

Coventry Canal

 

Separate requests for information have also been sent to wildlife and other organisations that may have an interest in the development proposals.

 

The range of environmental interests and potential effects of the proposed development are summarised in Table 2. 

 

Table 2: Environmental interests

Environmental interest

Potentially vulnerable to:

Landscape Setting

Visual impact

Flora and Fauna

Loss of habitats

Water Resources

Change in volume and run-off regime

Reduction in water quality

Impact upon groundwater

Impact on floodplain

Ground Conditions

Potential contamination linked to the established use of the site and neighbouring areas for industry

Human Resources

Noise , air quality, setting

 

 

6                    ANTICIPATED SCOPE OF WORK

6.1          Flora and Fauna

                The assessment process will involve a Phase 1 habitat survey and desktop assessment of national, regional and local planning policy guidance to establish policies of ecological relevance.

 

Habitats will be evaluated and mitigation measures will be assessed to include any opportunities for nature conservation and/or habitat improvement proposed as part of the development.

 

6.2          Ground Conditions

A desk study will be undertaken to identify the suitability of ground conditions for the proposed development and the existence of any contamination from historic uses of the site.  The study will direct subsequent site investigations that may be undertaken over a period of time to accord with phases of the redevelopment.  Therefore, for certain aspects of the redevelopment the EIA would provide recommendations for further site investigation work required.

 

Measures may be required in order to mitigate adverse ground conditions and residual contamination.

 

6.3              Water Resources

The assessment of water resources within and adjacent to the proposed development will utilise available information from the Environment Agency relating to the floodplain, groundwater and surface water courses. This information will be used to assess the effect, if any, upon adjacent water courses and groundwater.

 

Rising water levels have been recorded within the quarry void.  During the operation of the quarry, water levels were controlled by pumping into the Coventry Canal, in order to maintain a dry void suitable for mineral extraction.  The assessment would consider the local groundwater conditions at the site with a view to providing suitable mitigation measures for the restoration of ENV 2.

 

6.4              Noise and Vibration

A desk study will be conducted using the information derived from the Traffic Impact Assessment and the site design, to assess the noise impact from any likely changes to traffic volume flow.  The nearest noise sensitive receptors will be agreed with the local Environmental Health Officer (EHO), and noise predictions will be made for these properties based upon baseline measurements.  A preliminary baseline noise assessment has already been performed at properties adjacent to the site, and a summary of this survey is included as Appendix 1 of this document.

 

It is likely that draft conditions relating to temporary operations such as construction noise will be discussed with the EHO, although legislation and British Standards exist to control most noise from such operations.

 

 

6.5              Air Quality

The assessment of the impact on air quality from the alteration of traffic volume flow will be considered using data from the transport assessment, as agreed with the EHO.  Potential impacts upon air quality will be assessed with reference to national air quality standards.  Short-term impacts from construction and demolition will also be addressed.

 

6.6              Cultural Heritage

Former quarrying activity has disturbed the majority of the site; therefore detailed analysis is not required.  However, note will be taken of any adjacent or nearby features of interest.

 

6.7              Landscape and Visual Impact

The site is relatively well visually contained with existing vegetation providing a positive attribute in the context of the surroundings. Field study will be carried out to determine the sensitive receptors and the extent to which they are likely to experience visual disturbance. Appropriate mitigation such as new landscape planting and screening will also be assessed.

 

6.8              Traffic

                A Traffic Impact Assessment (TIA) has been undertaken (May 2001).  This was based on the development scenario contained within the Strategic Development Framework for Camp Hill Urban Village, which covered the new Local Distributor Road INF3, and addressed any concerns regarding the impact the proposed development would have on existing transport infrastructure of the surrounding area.  The results demonstrated that the proposed highway infrastructure will accommodate the traffic generated by the proposed development as well as future growth and positively contribute towards the Warwickshire County Council Local Transport Plan.  The TIA will be reconsidered with respect to the alternative site access and a summary of the results will be reported in the EIA.

 

6.9              Geology

The quarry has been designated as a Regionally Important Geological Site by the Warwickshire Geological Conservation Group.  The main features of the site are the unconformity between the Quartzite and the Triassic Sandstones and the contact of the sill and the quartzite.  The impact of quarry restoration on these features will be considered.

 

 

 

Transport Assessment

 

Hydrological Review

 

 

 

 

 

 

 

 

 

 

 

WS Atkins

Outline Reclamation Feasibility Study

March 1999

 

Contents

 

1.  INTRODUCTION AND SITE DESCRIPTION

2.  SITE PLANNING

Redevelopment issues

Land uses

  1. PLANNING PROCEDURES

Geology, hydrogeology and hydrology

Geology

Hydrogeology

Hydrology

Environmental Summary

Issues to be considered

  1. ENGINEERING ISSUES

Introduction

Use of overburden

Use of inert fill

Building on fill

Stability of quarry slopes

Key points

  1. TRAFFIC AND HIGHWAYS

Introduction

Traffic generation of proposed uses

Access Form and Location

Benefits of the Development

The Way Ahead

  1. PRELIMINARY CONCLUSIONS

 

 

 

1.  INTRODUCTION AND SITE DESCRIPTION

 

1.1  This is a brief report on possible site development opportunities at Midland Quarry, Nuneaton.  This report is to provide specific inputs to the client – Mininvest plc, to incorporate into an overall feasibility study for the redevelopment of the quarry.  The matters examined in this report comprise:

 

Geology and Hydrogeology

Engineering Issues

Traffic and Highways and

Site planning

 

1.2  It must be emphasized this is a very preliminary desk based assessment.  The purpose of this initial appraisal is to establish certain parameters, to guide early decision making on components of a redevelopment scheme and to outline possible next steps in developing proposals further.  This report has been prepared without topographical survey information or a detailed services search and any recommendation must therefore be treated as conceptual.

 

1.3  Midland Quarry is understood to be a former hard rock quarry owned and operated by British Coal.  The precise ownership boundary of the site is not absolutely clear, however it is understood that the site lies between Tuttle Hill, via Queen Elizabeth Road, whilst to the south west is an industrial estate accessed via a housing estate which in turn is accessed off Vernons Lane.

 

1.4     A footpath is believed to run an=long the north west boundary south westward from Tuttle Hill.  Little land is available for development prior to filling or partial filling of the quarry apart from on the south west adjacent to Bar Pool Brook and backing onto the industrial estate served off Vernons Lane.

 

1.5     land levels prior to extraction from the quarry are consistent at 90m+ along the south east side adjacent to the Coventry Canal but the natural land level rises to the north west with levels of 120m on Tuttle Hill and Queen Elizabeth Road.

 

1.6     The quarry is located approximately 1.5km west of Nuneaton centre.  The B4114 runs along the northern boundary of the site.  The Coventry Canal and railway track run along the south eastern boundary.  There is a hospital and school south of the railway both less than 500m from the site boundary.

 

1.7     A site visit has been undertaken and a photographic record compiled.  Key features noted were:

 

- the rural nature of the canal and the opportunities this could provide

- the presence of overburden near the top edge of the quarry, although the volume of this may not be that great

- toptgraphical variations on the land adjacent to the existing industrial estate which may limit the developable area

- a network of open spaces linked by footpaths in the surrounding area, and

- a footpath within the site leading to Tuttle Hill

 

 

 

2.  SITE PLANNING

Redevelopment issues

2.1     The quarry in Mininvest ownership appears to cover an area of approximately 18ha (40 acres).  This falls into three broad zones.  These are:

 

- the relatively flat land at a higher level in the quarry, adjacent to the industrial estate

 

- the main area of the disused quarry void; and

 

- the land near to Tuttle Hill and the canal which is mainly scrub areas together with some old industrial buildings on Tuttle Hill itself.

 

2.2     The size of the quarry, the three zones described above and the nature of surrounding land uses suggests a mixed use scheme comprising industry (B1, B2 and B8 uses), residential and recreational development wpould appear appropriate.

 

2.3     An initial estimate suggested that the site could potentially accommodate:

 

- 5-6ha + of housing;

 

- 3-4 ha of industrial uses;

 

- a local park and open spaces;

 

- a small office village; and

 

- some commercial uses (eg shops/leisure)

 

2.4     In order to be available for development substantial infilling of the quarry would be required.  Potentially this could be either putrescible waste or household waste and different implications arise from each.

 

2.5     Redevelopment of the site should not be seen as a stand-alone project but as fitting into the wider regeneration strategy for Nuneaton.  Potential uses on the Midland Quarry site may well be influenced by proposals for nearby brownfield sites particularly Judkins Quarry which will also be accessed from Tuttle Hill.

 

2.6     We recommend that mininvest retain a close watching brief on the redevelopment of adjacent sites as there may be threats (eg competing land uses) or opportunities, such as shared access imporovementsresulting in lower site development costs.

 

Land uses

2.7     Approximately 3-4ha gross of land is available for industrial development.  This would be suitable for B2 (general industry) uses and B8 (distribution and warehousing) uses.  Assuming a plot ratio of approximately 40% this would suggest a gross floor area of around 14,000m2.

 

2.8     The site can potentially comfortably accommodate 5-6ha (12-15 acres) of housing. <note this assumes infilling of whole quarry void> At an average density of say 12/acre this suggests potentially 140-180 dwellings.  In practice the developable area will be determined by site topography and the need to fill land.

 

2.9    In addition to the above the site lends itself to the creation of a local park.  This could potentially be donated to the local authority as a planning gain.  The park could accommodate a range of features designed to improve the marketability of the housing <note if housing forms part of the scheme a more likely offered planning gain is a footbridge across the canal linking footpaths in the area>.

 

2.10The canal also provides the opportunity to develop mooring facilities or possibly a small canal basin.  This could be located adjacent to the existing public house and other uses such as craft workshops, restaurants, small scale shopping and other leisure facilities would be compatible with such uses.

 

2.11  A small office village is proposed along Tuttle Hill near the first site access providing a visible location.  The site covers an area of approximately 0.75ha and in conjunction with the canal basin could provide high quality office units in an attractive setting.

 

 

Planning Procedures

 

2.11  It is understood that Mininvest may be considering the submission of an outline planning application to establish the principal of a certain type and volume of development on the site.  There are two main issues to consider:

 

i        For minerals and waste disposal, Warwickshire County Council is the relevant planning authority.  Waste disposal applications have to be full detailed planning applications, including means of access (eg rail sidings), waste volumes, types, working methods, final levels and so forth.  An Environmental Statement may well be required.  It is difficult toi define such measureswithout some involvement of waste disposal operator or potential operator.

 

ii     Industrial and housing development proposals fall within the remit of Nuneaton and Bedworth Borough Council.  It is possible to submit an outline planning application incorporating an overall site masterplan for housing, industry and recreation.  However to a certain extent this application is dependant on the waste disposal application.  Planning applications need to be stand alone and careful consideration and co ordination between two applications is required to ensure a coherent overall scheme for the site.

 

2.12  In terms of the next steps a more detailed masterplan depends on undertaking access and waste disposal / filling analyses.  In parallel with this it would be advisable to discuss a masterplan in more detail with the District Council.  To prepare an outline planning application will require some details of finished levels, clear boundaries and required infrastructure (roads and services).

 

3.  GEOLOGY, HYDROGEOLOGY, AND HYDROLOGY

 

3.1     an initial appraisal has been undertaken.  Information sources consulted include:

 

- Ordnance Survey Landranger sheet 140 1:50,000

- British Geological Society (BGS) sheet 169 Drift edition 1:50,000

-  Policy and practice for the Protection of Groundwater, NRA

- Geology memoirs: extract from geology of Coventry

-  Andy Cowan, Warwickshire CC (Planning Department)

-  Environment Agency, Severn Trent

 

Geology

 

3.2  The BGS maps shows the majority of the site to be underlain by the Hartshill Quartzite (Cambrian).  Stockingford Shales (Cambrian) may be present in the North West of the Site.  The Cambrian Rocks have been metamorphosed by igneus intrusions (sills).  The sills are present as diorite bands.  The south eastern part of the site is shown as underlain by Keuper Sandstones (Triassic) (renamed Sherwood Sandstones).  There may be some alluvial deposits adjacent to the south western boundary associated with the surface water course.

 

3.3     There is a major fault line (running north west to the south east) less than 50m to the north of the site between the B4114 and the canal.  Keuper Marl (?Mercia Mudstone) is present to the north of the fault line.  The middle coal measures outcrop approximately 500m to the west of the site.

 

Hydrogeology

 

3.4     Cambrian strata are classed as non aquifiers and comprise various shales, volcanic rocks, grits and quartzites which have been techtonically deformed and highly indurated.  They contain little groundwater except in areas where deep weathering has produced a sub surface permeable zone in which perched water tables may occur.

 

3.5     The Sherwood Sandstones are classed as a Major Aquifer and comprise poorly cemented, locally pebbley sandstones with thin beds and lenses of mudstones.  Flow is predominately intergranular but is enhanced by fracture systems in areas of mining subsidence.  Permeability, both intergranular and fissure, tend to be high.

 

3.6     The Alluvium deposits associated with water bodies may contain groundwater in hydraulic continuity with the surface water body.

 

Hydrology

 

3.7     The Coventry canal runs adjacent to the south eastern boundary of the site.  A stream <the Bar Pool Brook> which appears to discharge into the canal at the southern part of the site flows along the south western boundary.  <A stream, the Holly Stitches Brook, flows into a reed bed and along a ditch running parallel to the Bar Pool Brook and appears to discharge into the canal.>  A spring is reported along the north western boundary.  The void is reported to contain standing water which was previously pumped.

 

Environmental Summary

 

3.8     The Environment Agency report that the site is underlain by a non aquifer.  In addition the EA report that there are no licensed abstractions within a 1km radius of the site and that the site is not located within any currently Source Protection Zone.

 

3.9     Given the above the site is located in an area that would be considered low sensitivity in terms of the groundwater as a receptor.  However it should be noted that fracture systems in the rock may provide a high secondary permeability and this may have a bearing on the engineering required for a waste management facility.

 

3.10   Water is reported to be present in the base of the quarry.  It is understood that a borehole was constructed on the site during quarrying operations.  It is possible that the borehole was required to dewater the quarry.  If this is correct this will have implications for the landfill design in terms of pumping and disposal of groundwater.

 

3.11  There are a number of surface water bodies close to the site.  These represent water management issues which need to be addressed at the design stage.  The construction and sensitivity of the canal needs further investigation. The spring (if present) <I think we have found it but not where we were expecting it if the shallow void water ingress turns out to be a spring rather than a borehole>  and the ditch adjacent to the site will require engineering.  The spring and ditch may require temporary/permanent diversion/culverting during landfill operations.

 

3.12    The site is located in a mixed residential and industrial area.  Issues such as traffic, odour, noise, dust, vermin (including birds) and site security will need to be considered as well as the obvious gas and leachate ones.

 

3.13    Initial consulation with Waste Planning officers at Warwickshire County Council has revealed that the site is identified for restoration by landfill in the Draft <now adopted> Warwickshire waste Local Plan.  This Local Plan has been subject to an inquiry and the Inspectors Report is due in September 1998.  The Environment Agency has not objected to the above designation of Midland Quarry.  Planning Officers stated that the main problem with the site is access and a road access proposal is unlikely to be acceptable.  Rail and Canal transport would be possible.

 

Issues to be considered

 

3.14  A detailed feasibility study is required before deciding on whether inert waste is viable.  The environmental aspects of this should encompass:

 

- Comprehensive site specific environmental risk assessment – detailed review of geology/hydrogeology and potential receptors;

 

- check Waste Local Plan for waste management policy for the area.  Initial enquiries indicate the void is suitable for restoration by landfill;

 

- consult the Environment Agency

 

- potential void space volume and site development costs;

 

- waste arising study;

 

the current situation for waste disposal (what where and lifespan); and

the current situation for waste arisings and future projections

 

3.15  This would need to be followed up with site investigation to confirm geology, hydrogeology, engineering properties of the substrata and background gas levels and surface and groundwarer quality data.

 

  1. ENGINEERING ISSUES

Introduction

 

4.1     There are a number of engineering issues associated with reclamation and development of a site of this nature.  These issues include:

 

- use of overburden to fill shallow part of the quarry

- use of inert fill material in the main quarry void

- building on fill; and

- stability of quarry slopes

 

Use of overburden

 

4.2     In order to consider how appropriate it is to use the overburden to fill the shallow part of the quarry it is necessary to establish the nature and volume of the existing overburden together with the groundwater regime.

4.3      It is assumed that the stockpiled material on the southern side of the quarry is overburden and that it is a wathered form of surface geology in the area generally.  The nature and properties of this material need to be defined.  The volume of overburden material is unclear but we estimate that in the shallow part of the quarry a depth of upto 25m needs to be filled.

 

4.4     The groundwater regime is important and it is necessary to establish the level of the water table and whether that is rising.  If the water table is rising and will reach the shallow quarry then the principle of filling is more difficult.

 

 

4.5     Fill settlement and the rate of settlement depend on the above factors but particularly the nature of the overburden material.  Generally for filling of this depth or greater settlement will be slow with 50% settlement occurring over a period of several years.  Potentially well compacted granular fill could reduce this timescale (eg appropriate colliery spoil).

 

Use of inert fill

 

4.6     from available mapping/drawings we have estimated the total void volume to be of the order of 3.8m cu m.  The depth of the pit is approximately 60m although the depth of water is unknown <we now have a survey> We have assumed only inert waste will be used to fill the pit due to the fact that development on a household landfill would not be appropriate and this would sterilize other potentially developable land in the quarry.

 

4.7     To assess the prospect of filling the quarry with colliery spoil/mudstones requires and understanding of the groundwater regime including water table level, geology and hydrogeology.  The method of handling wastes and actually filling the site would also need to be considered.  It will almost certainly be necessary to pump the base of the quarry dry and options for disposal of this water will depend on whether the quarry water is groundwater or rainwater.  On completion of filling operations wastes would need to be capped with an engineered clay cap.

 

Building on fill

 

4.8     It would not be appropriate to consider building on filled voids unless inert wastes are proposed.  Bearing capacity of the filled ground is unlikely to be a limiting factor.  Fill settlement will be critical and the rate of settlement is as important as total settlement.  Settlement will be almost entirely due to the weight of the proposed fill rather than the loading of any proposed building.

 

4.9     Conventional raft foundations are likely to be required.  Piled foundations would be less appropriate.  The most cost effective site is to operate the site using well compacted fill rather than using ground improvement techniques after the completion of filling.  Flexible services joints in and out of buildings are likely to be required to accommodate differential movements.

 

4.10    Filled ground favours building small units due to settlement.  Large units and terraces of houses should be avaided.  Buildings close to the quarry edge (within the quarry edge) should similarly avaoided as variable fill depths will increase the probability of differential settlement.

 

4.11  Desk study, walkover survey and a ground investigation will be required to establish relevant properties.  In order to analyse slope stability (vital f any slopes are retained in development areas or roads/buildings are proposed near quarry edges) information on ground conditions, the groundwater regime and water infiltration is required.  The construction of a new access road to serve and industrial estate does raise geotechnical issues if close to the edge of the quarry.  Some reduction in quarry slope may be necessary although the rock is likely to be stable.  Prior to road construction, partial (and deep) filling of the quarry could assist in stabilizing the slope.  Slope reduction may then be less likely to be needed.  Constructing the access road with a finished level 1 or 2m below existing would help with both its stability and noise generation.

 

Key Points

 

4.12  In principle the overburden could be used to fill the shallow quarry area but its volume and nature are unknown at this stage.  Subject to engineering factors (ie compaction and settlement) this filled area could be developed given time.

 

4.13  In principle the main quarry void could be filled with inert waste subject to the effects on the groundwater regime.  Development on the filled void would very much depend on the nature of the fill material and compaction/settlement issues.

 

4.14  If quarry slopes are retained in any redevelopment scheme or if construction is top take place near the edge of quarry slopes, slope stabilities will need to be analysed.

 

  1. TRAFFIC AND HIGHWAYS

Introduction

 

5.1     The greatest problem is the size of the quarry in relation to the total site area.  This means firstly that initial access options to open up the site are extremely limited.  With regard to access the options prior to filling are limited.  Information would be required on present day and forecast (due to existing commitments) traffic movements.  Accident records would require to be analysed to ascertain if there are any accident concerns which may limit the acceptability of an access proposal.  Speed information from a survey may be required to demonstrate adequate visibility to achieve a safe junction and a topgraphical survey will be required in order to assess the options available with appropriate visibility.

 

5.2     As in all cases relating to access issues ownership or control of land to the public highway boundary is an absolute requirement.  The presence of any third party land holding is an effective ransom against the development.  Thus it is essential to acquire rights (by ownership or options) over all land that is expected to be needed for access purposes including associated sight linesbefore achieving a consent for development.  Generally this entails obtaining this interest prior to making an application as after this time the intention to develop is public knowledge and affected land has enhanced hope value.

 

Traffic generation of proposed uses

 

5.3    For the purposes of a traffic impact assessment we have taken the preferred development option is: < assuming main void is filled>

 

- approximately 5 hectares of housing

- approximately 3.5 hectares of B2/B8

- approximately 1.5 hectares of B1 retail and leisure

- remainder open space parkland

 

5.4  The area for housing would easily support 150 dwellings (at an average of 12/acre).  This is probably the most that would be accepted off a single cul-de-sac type road or loop road served from one access.  It is noted however that some highway authorities will accept upto 300 dwellings, although this number could not easily be achieved within the proposed residential site area.  150 dwellings could be expected to generate of the general order of 100-150 vehicle movements in the peak hour, split 75 per cent outbound and 25 per cent in the AM peak hour.

 

5.5      3.5 hectares of industrial land is assumed to give 14,000m2 of GFA.  This can be expected to produce of the order of between 160 and 400 inbound trips in the AM peak hour and 60 to 140 outbound trips if it is all in industrial use.  However storage and distribution generates 65 to 135 inbound trips and 20 to 40 outbound trips in the AM peak hour.

 

5.6     B1 office use on 1.5 hectares can be expected to give 5,500-6000m2 of office space.  This would attract 170 to 300 inbound movements and 20-35 outbound movements in the morning peak hour.

 

5.7     Hence assuming 150 dwellings and 60 per cent industrial, 40 per cent warehousing suggests a traffic impact in the AM peak hour of:

 

 

Outbound                              Inbound

Housing                                                                                 75-112                                     25-38

Industrial (at 60%)                                                               36-84                                       100-240

Warehousing (at 40%)                                                        8-16                                         26-54

Office                                                                                     20-35                                       170-300

 

Total impact                                                                          139-247                                   321-632

 

This gives a 2 way flow at the highway access of 460-879 vehicles.

 

Access Form and Location

 

5.8     Any access is likely to include provision for pedestrians and cyclists.  Given this and the nature of Tuttle Hill which is believed to be subject to an urban seed limit but also due to its open nature currently encourages high speed of traffic movement it is considered that a traffic signal controlled junction may be the most appropriate solution.  There are a number of potential advantages to the highway authority and the developer with this form of junction:

 

- it breaks up and reduces the speed of traffic on Tuttle Hill

-  it provides certainty to those served by the side road that they will get safe exit opportunities;

-  it can provide by pedestrian phases for safe pedestrian movement,

-  it is potentially easier for cyclists than a roundabout

-  it does not normally require a significant defelection of the main road as is required for a roundabout.

 

5.9     To ensure a traffic signal junction or roundabout were acceptableat any of the locations considered it would be necessary to measure both the traffic flows to design the junction to accommodate the volume of traffic expected to use the junction and the visibility.  Whilst turning visibility requirements at traffic signals are reduced (from and of side traffic) good forward visibility from the signal heads is required on all approaches.  Advisory/warning signing, indicating signals ahead may be accepted by the authorityas an additional aid where direct visibility is less than desirable (but not below the minimum acceptable).

5.10    Three locations have been considered and appear subject to the necessary detailed surveys and analyses to be possible.  These are:

 

- One at the extreme north west of the site would impact on the house at Tuttle Hill.  The margin between the edge of the quarry and assumed edge of the Mininvest site ownership may be minimal and some additional width/support/stabilization may be required depending on the road location.  The need to minimize this cost by running the road close to the boundary may cause a problem with the 3rd party land at the junction where a radius kerb is required to the west side at Tuttle Hill.  Land on Tuttle Hill would appear to be available to widen the roadat the junction to provide separate straight ahead and turning lanes.

 

Subject to negotiations with the Highway Authority and consideration of verge widths etc as proposed by the local planning authority it is considered that a corridor of some 15m would be required at this location.  For the purposes of initial discussions with the appropriate local authorities we would propose one wide footway of 2.5m with a 1 m verge to separate from a 10m carriageway (to contain within this two one meter cycle lanes <cyclists now accommodated down Bar Pool Brook so 7.3m carriageway envisaged> On the quarry side of the carriageway provision of a 1.5m verge with a crash barrier and behind that unscalable wire fence to control entry to the quarry.  All of this would need to be on consolidated ground of adequate strength and structural integrity to support the loads of a vehicle hitting the crash barrier etc.

 

- a second location again using a traffic signal junction appears to exist at an existing access point one third of the way along the northern frontage to Tuttle Hill.  This would however require the quarry void to be filled and the consent of the Highway Authority to impose a T junction shortly after entering the site.  This would enable housing to be accessed by one smaller road and a wider facility to be constructed to serve an industrial development.

 

- a thid option that would be more difficult in terms of forward visibility of signals is believed to exist towards the eastern end of the site.  It may be that this would be provided as well as an access at the western end so that filling of the main body of the quarry could be a long term objective and the benefit of housing development overlooking the canal could be started whilst industrial development and quarry filling occurred via a western access.  If this was limited to residential access, and with some demolition of frontage buildings it may be possible to achieve a simple priority junction in this area.  With residential use only the flows are as noted above considerably reduced.  However this would depend on flows on Tuttle Hill and the extent to which there are opportunities to join that traffic movement as well as the problems of forward visibility (expected to be over a 90 m distance from 9 metres back from the junction on the side road).

 

5.11  The potential benefits and disbenefits of alternative highway arrangements within the site will need to be fully assessed.  Separate accesses for employment and residential areas from Tuttle Hill would probably maximize the value of each development site.  Linkage between them may not be necessary for motor traffic, however a footpath/cycleway link would demonstrate that efforts are being made to enable trips to be made by non-motorised mode.  This would be appropriate in terms of promoting a less road traffic reliant scheme.  The need for a link depends on the level of development proposed likely trip generation and the views of the Highway Authority.

 

5.12  Alternatively it might be possible to have one major access junction from Tuttle Hill with separate accesses to residential and employment areas fed from this main junction.  Access to employment should not be through a residential development or the opposite (ie access to residential traffic passing through an industrial/employment estate).  However the potential volume of traffic from both development centres may be more than can be accommodated at one junction on Tuttle Hill.  Again numerical analysis would be required to resolve this question and consideration may need to be given to other proposals on the north side of Tuttle Hill.

 

5.13    The feasibility of providing a link between the existing industrial estate and thepotential industrial land is far from certain.  The extent of land available to create such a link is unknown.  More importantly there is a difference in levels between the two sites of 1-2m and Bar Pool Brook would need to be culverted or bridged.  If the connecting link is for 2 way HGV movements then a considerable area for turning movements would be required.  It may be possible to design a roundabout junction instead.

 

Benefits of the Development

 

5.14  Housing near the canal on the eastern end of the site would be very accessible to nuneaton town centre.  The near side of the ring road is within 1 kilometre (about ½ mile) whilst the far side of the same ring road is only 1.5kilometres away (less than 1 mile).  Hence the whole central area is with 15-20 minute walk or a few minutes by bicycle.  This means that such development should be considered sustainable in transport planning terms as it does not require the use of motorized transport for most journeys.

 

5.15    Development of industrial uses depending on location and access proposals may provide a means of accessing the existing industrial estate without requiring vehicles to pass through housing areas as they appear to have to at present.  This could with the north western access in particular run through to Hillary Road and thereby improve the amenity and environment of existing housing areas and hence be a significant planning gain achieved by providing the development.

 

The Way Ahead

 

5.16  The problems, possibilities and costs associated with dealing with the large quarry are considered to be the critical issue.  Once the location and areas of land that can be recovered for building land and whether this is suitable for housing or for industry has been accurately determined it would be appropriate to obtain:

 

- traffic flows

- traffic speed

- visibility data (this latter as part of a full topographical survey on Tuttle Hill and other appropriate areas of the site)

 

5.17  It would also be essential if the westernmost access were considered to prepare a detailed scheme to accommodate the road as it passed by the western edge of the quarry and to confirm with the appropriate authorities what safety measures such as crash barriers, fencing and so forth were required and hence if this access could be achieved at a viable cost or whether further land beyond the Mininvest ownership to the west is necessary.

 

6.  PRELIMINARY CONCLUSIONS

 

6.1     In principle based on limited desk study the site appears to have potential to accommodate inert waste infilling using rail and/or conveyor based transport and development for industrial residential and recreational uses.  Consideration needs to be given to development proposals on adjoining brownfield sites as these may have positive or negative implications for the development of Midland Quarry.

 

6.2     At this stage it is not possible to identify precise developable areas of land.  Site topography, geotechnical considerations, infrastructure needs and the views of the planning authority (via appropriate planning approvals) need to be taken into account.  Our initial view is that 3-4 ha of industrial land could be developed together with 5-6ha of housing land and an office village plus some commercial leisure elements (eg pub/restaurant, health club, shops etc) located around a new canal basin or similar focus.  It is not clear at this stage whether linked accesses will be necessary.

 

6.3     In order to progress concepts for the development of the site there are two principla issues which require more investigation.  These are landfilling and access.

 

6.4     Residential development cannot take place without filling or partial filling of the quarry and therefore the feasibility of this needs to be examined as a priority.  The critical matters which need to be confirmed are:

 

– the nature source and likely volumes of inert waste;

- measures required to ensure that this inert fill can be built on;

- the costs/viability of such a fill proposal (including transport/handling facilities); and

- the timescales involved ie when could housing development take place.

 

6.5     In principle industrial development could take place in advance of filling and residential development.  The key to achieving this is the provision of a satisfactory access.  There are two key matters to be considered:

 

- whether an appropriate access can be accommodated within Mininvests current land ownership.  This in itself requires clarification with the Highway Authority to confirm their requirements in terms of road width and type of junction.  Our preliminary view is that further land may be required.

 

- related to the above is the geotechnical aspect of constructing a new road or building adjacent to the quarry edge.  It is by no means certain that this can be achieved at reasonable cost and further investigation is required.

 

6.6     With regard to the residential development site it would be possible in principle to create a high quality scheme incorporating new open space and commercial uses.  Proximity to a canal and canalside walkway a new local park and Nuneaton town centre suggests this represents a good potential housing site.  It is possible that some land could be developed for housing irrespective of industrial development or waste disposal.  Feasibility clearly depends on filling the quarry and being able to build on the filled land.

6.7     A small office village and leisure/recreational facilties could be developed around a new canal basin or similar focus near Tuttle Hill.  Some development in this location could potentially take place in advance of filling of the main quarry.

 

6.8     In order to develop the conceptual plan into an outline planning application it will be necessary to:

 

– establish the feasibility of landfilling and development thereon; <or alternative use of the void as a waterbody with eg tourist houseboats on>

- decide what the application is to cover: housing, industry or both;

-  define land areas, potential floorspace and uses;

-  identify all services and service requirements;

-  ensure layout is compatible with topography (via a survey)

-  discuss scheme with Planning Authority and Highway Authority

-  refine layout/road detail as appropriate

-  prepare structural landscape scheme

 

  1. THE NEXT STEP

 

7.1     Mininvest has proved to be a company who are interested in the long term development potential of not only this but other similar brownfield sites.  They seem to be concerned with the future viability of these sites both in terms of community as well as in terms of employment.  Their stated aim is to provide sustainable development in preference to quick profit and this is admirable.

 

7.2     if they are to achieve success in this aim it must be noted that the roblems associated with developing sites such as these are immenses.  At Midland Quarry we have highlighted some of these problems and Mininvest will need to address these before development can take place.  Considerable research will need to be carried out before they can make final decisions on what and how the land can be used.  The scope of this report is too narrow to answer all the questions but we believe that we have attempted to at least answer some and highlight others.

 

7.3     In addition to posing what we believe are significant questions WS Atkins have prepared a series of drawings to accompany this report which show possible future options for land use.  The drawings show a possible strategic policy for the site that could be used in whole or in part dependent on agreement with the local planning department.  It should be noted that final studies as mentioned above may affect the viability of these options and that full research will need to be commissioned by Mininvest before definite proposals can be finally defined.

 

7.4     WS Atkins are pleased to have been asked by Mininvest to carry out this initial study and trust that it will be of assistance in finding a successful solution to the use of this valuable site.

 

Appendix 1

 

Plans showing phased restoration and redevelopment of former quarry site

 

Phase one – Land adjacent to pool Road Industrial Estate

Phase two – Land adjacent to Tuttle Hill Road

Phase three – Replacement of Lake with deep void filling

Phase four – deeper void filled – urban village complete

 

Hosted by www.Geocities.ws